* Preparing the review:
- WP1 - Performance study and optimisation
- Measurement requirements
- Instrument requirements
- Simulation tool, study framework
- ACTS
- Specifications (target, tracker)
- Expected instrument performance
- WP2 - Gas target
- Target requirements
- Intergration at IR4
- Location (just the final ones)
- Beam aperture
- Distributed target tank design
- Design (Teresa)
- Impedance
- Vacuum considerations
- Radiation issues
- The BGC option
- WP3 - Tracker
- Design
- Module
- Ring assembly
- Support structure
- Front-End electronics
- Power
- Optical tranciever board
- Alignment
- Tracking stations
- LHC coordinates
- Realisation
- Production
- Commissioning (TimePix commissionning)
- Installation
- WP4 - DAQ and Analysis
- Back-end electronics
- Data processing (~ Online tracks and vertex reconstruction)
- Alignment
- Vertex resolution (SVM)
- Measurement
- WP5 - Planning and Budget
- Timeline
- Budget
- Gas target
- Vacuum chamber and coating
- GIS and pumps
- Tracking detector
- DAQ
- Infrastructure
- Cables and optic fibers
- Cooling water
- Racks
- Personal
There are minutes attached to this event.
Show them.