SSD weekly
======== General ========
- There was no power cut in ssd laser lab
- bug lasermet: new procedure for interlock opening -> only open interlock door if both lights (Override & Door unlocked) are on
- Moritz arrives in October
- Monday around 10am: visit from salesperson from Rhode & Schwartz for oscilloscope -> ask for warrity
- Window shutter maintenance in CVIV and SUSY lab
Vacation:
- Sebastian: 26.08 to 09.09 + Travel to home university: 12. to 16.09 -> back at SSD 19.09
Conference:
- Yana at GADEST-19 at Mondsee 10.9 to 16.9
======== Ruddy ========
- proposed long term changes for the CVIV: new top cover that opens in a different way and high resolution camera instead of microscope
- solved storage problem of the temperature monitoring PC in the laser lab together with computer service
- maintained the CVIV setup together with Yana: light shielding updated, lock system to close cover redone and counterweights configured
- updated general safety forms for ssd labs + training forms -> requirement from management -> needs to be discussed with Michael
======== Marcos ========
- back at ssd on Monday
- Testbeam was successful -> measured irradiated and non-irradiated samples in EU-Telescope with CMS detectors
-> also did B field (3T) measurements
======== Pawel ========
- final report next week -> next week already last week
======== Anja ========
- paper is foreseen to be submitted on Monday to NIMA after discussion with Michael + check acknowledgement
======== Yana ========
- DLTS has problems with parallel capacitance measurements -> seen in irradiated and unirradiated diodes -> unusual drop in parallel capacitance measurements
-> probably related to some change in the setup (maybe something broke) -> contact manufacture Hystech about the problem
======== Sebastian ========
- Measurements with Johannes Wuethrich from ETHZ
- Yesterday the oscilloscope in TPA-TCT stopped working -> Exchanged it a the E-pool together with Esteban -> setup is operable again