FCC-ee tuning meeting
SuperKEKB optics tuning, Y. Onishi
Optics correction one day every 2 weeks (maintenance day), and frequently every week. Golden orbit is reset. Heating from radiation and impedance, collective effects and non-linearities come into play concerning optics tuning. IP tuning is done daily.
Betas are measured from fits of orbit distortion. Dispersions are measured from dp/p shifts. X-Y coupling is measured from vertical orbit leakage from horizontal bumps. Skew quad coils at sextupole magnets are used for coupling correction. Beam current is very low during optics measurements and correction (50 mA). Vertical emittance is measure with SR monitor.
Orbit feedback is applied every 15s, size of corrections~ 1um.
20um at a an HER IR sextupoles causes 0.01 tuneshift.
Daily variations of vertical tune shift was observed assumed to come from orbit at sextupoles and impedance.
Orbit control within 10um should be considered. Arc sextupoles should also be considered.
There are displacement monitors between sextupole and quadrupole, but sometimes unreliable.
Horizontal tune shift with intensitiy is not understood.
Beta-beating changes by ~20% with beam current.
Local orbit bumps are needed at each sextupole. In between sextupoles orbit cannot fit the golden orbit. This improves injection efficiency. The situation in LER is less severe.
Earthquake changed emittance in HER. This was cured with X-Y coupling correction (no orbit change was seen). The needed rotation in QCS to explain coupling was 10 urad.
Vertical waist knob has a range of about 2mm (twice beta*), using QCS.
The problem measuring optics at large intensity is the heating from SR.
They recommend to attach BPMs to sextupoles to get low error on sextupole offset. Movers are difficult to use in HER (in LER these are actually used). A robust sextupole mover and position system could mitigate may of the difficulties observed in the FCC-ee tuning (cost of this is unknown). This is probably in line with the assumption of CEPC of having 10 um sextupole positioning accuracy.
10-20% of the operational time is devoted to optics tuning.
TbT optics measurements can be performed during physics operation, no lost time. Investment on optics control hardware will pay off in luminosity by reducing the 10-20% of operational time.
Jacqueline asks if it would be possible to kick and measure 10 bunches. Maybe difficult to kick 10 bunches with feedback system.
FCC-ee IR matching and knobs, Leon
Leon succeeded to match IRs with realistic errors for betas, phases and dispersions. Couping is for now neglected.
This is a very promising result towards actual tuning. Indeed the only hard quantity to measure is IP optics. Leon will try to remove IP constrains to see results.
Concerning knobs symmetric and anti-symmetric changes to the final quads (left and right of IP) can be used to control beta* and waist to large ranges. Dispersion needs to be worked out. This together with previous development looks very promising to accomplish successful optics control in FCC-ee.