9th meeting on HEMAC discussions

Europe/Zurich
Zoom

Zoom

    • 16:45 16:55
      Stability thresholds of first RCS stage for resonator wakefield 10m
      Speaker: Dr David Amorim (CERN)
    • 16:55 17:05
      How many RF stations do we need in the RCS chain? 10m
      Speaker: Fabian Batsch (CERN)
    • 17:05 17:20
      Discussion 15m

      Few open points for follow-up:
      - Optimize losses in RCS chain for best overall performance, allowing different transmission in the two or three machines
      - Would two RCS be sufficient to accelerate from 60 GeV to 1.5 TeV?
      - Cost functions per machine part: could one make an assumption for a cost per unit length of RF (plus some infrastructure cost offset per RF section), idem for unit length of magnets?
      - Average gradient of RF sections: 30 MV/m
      - Resistive wall impedance?
      - Is transition gamma of ~20 a good number for the first RCS stage?
      - FFA alternative for RCS?

    • 17:20 17:30
      Round table 10m
      Speakers: Alexej Grudiev (CERN), Antoine Chance (CEA Irfu), David Amorim (CERN), Elias Metral (CERN), Fabian Batsch (CERN), Heiko Damerau (CERN), Ivan Karpov (CERN)