Meeting with BE-CEM

Europe/Zurich

Notes:

  • Install / dismantle equipment in a tree: technical issue with software libraries. Lukasz et al will check when an EAM Light sprint can be scheduled
  • Allow eGroup to be used as responsible for EAM equipment: proposal to define a new UDF with no consistency checks. Once operational the layout service will be informed
  • Expire functional positions from layout DB: technically possible through web-service (REST API). Another option would be defining an expiry date on EAM equipment
  • Rename functional positions: question whether this should be possible and how to prevent misuse (Goran/David)
  • Generate part from Naming interface : further discussion required (David)
  • Add status information to a part to say that it's no-longer supported in new installations (can be used to replace old parts)
  • Issue with stock level notifications across several EAM stores : unclear what the issue was but BE-CEM solved the problem themselves through a database view and a dedicated application
There are minutes attached to this event. Show them.