Notes:
- Install / dismantle equipment in a tree: technical issue with software libraries. Lukasz et al will check when an EAM Light sprint can be scheduled
- Allow eGroup to be used as responsible for EAM equipment: proposal to define a new UDF with no consistency checks. Once operational the layout service will be informed
- Expire functional positions from layout DB: technically possible through web-service (REST API). Another option would be defining an expiry date on EAM equipment
- Rename functional positions: question whether this should be possible and how to prevent misuse (Goran/David)
- Generate part from Naming interface : further discussion required (David)
- Add status information to a part to say that it's no-longer supported in new installations (can be used to replace old parts)
- Issue with stock level notifications across several EAM stores : unclear what the issue was but BE-CEM solved the problem themselves through a database view and a dedicated application
There are minutes attached to this event.
Show them.