- repair of Cold box: problem with HX. A new one has to be supplied ==> Olivier
- interference with vent line ==> Nicolas will supply the 3D models ==> Frederic to contact Christian and Florian
- feet of Fresca 1 ==> Frederic to verify the status and if needed take actions
- installation of F2 outer cryostat: from 28/09
- transport of F2 inner cryostat to B163: 19/09
- Platform: corrections done
Fredric will organize weekly meetings with the team on Mondays morning
There are minutes attached to this event.
Show them.