Present: T. Capelli, D. Glenat, A. Infantino, C. Pasquino, V. Rude, N. Valverde Alonso
Quick review of document : MIP -Crab RFD CM Testing SM18 ( EDMS 2756481)
The jacks to be installed in M7 will be LHC type (not HL-LHC). In the past WP3 confirmed that they can lend 3 jacks to us. Vivian to launch again the enquiry to confirm if it is still fine.
Teddy will prepare a drawing of the Jacks in M7. Nuria will use the drawing to organize the drilling of the floor. The position of DQW-CM jacks will be different, and additional holes will be required in the future.
Nuria to inform Chiara when the cabling has been done so she can check it.