Crab cavity cryomodule test in M7 bunker (VII)

Europe/Zurich
CERN

CERN

zoom
Katarzyna Turaj (CERN), Nuria Valverde Alonso (CERN)

Present: T. Capelli,  D. Glenat, A. Infantino, C. Pasquino, V. Rude, N. Valverde Alonso

 

Quick review of document : MIP -Crab RFD CM Testing SM18 ( EDMS 2756481)

 

The jacks to be installed in M7 will be LHC type (not HL-LHC). In the past WP3 confirmed that they can lend 3 jacks to us. Vivian to launch again the enquiry to confirm if it is still fine.

Teddy will prepare a drawing of the Jacks in M7. Nuria will use the drawing to organize the drilling of the floor. The position of DQW-CM jacks will be different, and additional holes will be required in the future.

 

Nuria to inform Chiara when the cabling has been done so she can check it.