-
10:06
Visual Inspection of the CMS Phase 2 Outer Tracker hybrid electronics
-
Krisztina Marton
(Wigner Research Centre for Physics (Wigner RCP) (HU))
-
10:07
DAQ chain tests for 2S modules for CMS Phase2 outer tracker upgrade
-
Matteo Magherini
(Universita e INFN, Perugia (IT))
-
10:08
Upgrade of the CMS ECAL Barrel Off-detector Electronics and Trigger for the HL-LHC
-
Ka Wa Ho
(University of Notre Dame (US))
-
10:09
Reconstruction of unconverted photons in the presence of high pileup at the CMS Phase-2 High Granularity Endcap Calorimeter
-
Alessandro Tarabini
(LLR, École polytechnique (FR))
-
10:10
Precision Timing using CMS barrel MIP Timing Detector
-
Amrutha Krishna
(Northeastern University (US))
-
10:11
Development and firmware implementation of a Machine Learning based hadronic Tau lepton Level-1 Trigger algorithm in CMS for the HL-LHC
-
Jona Motta
(LLR, École Polytechnique (FR))
-
10:12
CMS Level-1 Trigger Scouting system upgrades for LHC Run 3 and Phase 2
-
Rocco Ardino
(Universita e INFN, Padova (IT))
-
10:13
EGamma algorithm for CMS Phase-2 Level-1 Calorimeter Trigger
-
Stephanie Kwan
(Princeton University (US))
-
10:14
Performance of Digital Pixel Test Structure for the ALICE Inner Tracking System upgrade
-
Roberto Russo
(Nikhef National institute for subatomic physics (NL))
-
10:15
Data-driven and ML-based approaches for the ALICE TPC space-charge distortion corrections
-
Matthias Kleiner
(Goethe University Frankfurt (DE))
-
10:16
Characterization of pre-production staves in the system test structure for the ATLAS ITk Strips detector upgrade
-
Punit Sharma
(University of Iowa (US))
-
10:17
Characterization of pre-production 3D FBK sensors for the ATLAS ITk Pixel detector upgrade
-
Leonardo Vannoli
(INFN e Universita Genova (IT))
-
10:18
Test of a prototype of calibration board for the phase-II upgrade of the ATLAS liquid argon calorimeter readout
-
Gitanjali Poddar
(Centre National de la Recherche Scientifique (FR))
-
10:19
A Burn-in test station for the ATLAS Phase-II Tile calorimeter low-voltage power supply transformer-coupled buck converters
-
Ryan Peter Mckenzie
(University of the Witwatersrand (ZA))
-
10:20
Commissioning of the LHCb Scintillating Fibre Tracker
-
Chishuai Wang
(Ruprecht Karls Universitaet Heidelberg (DE))
-
10:21
Simulation studies for gas injection into the SMOG2 storage cell at LHCb
-
Chiara Lucarelli
(Universita e INFN, Firenze (IT))
-
10:22
LHCb RICH Upgrade commissioning
-
Edoardo Franzoso
(Universita e INFN, Ferrara (IT))
-
10:23
Online Monitoring of the Velo at LHCb
-
Anja Beck
(University of Warwick (GB))
Bhagyashree Pagare
(University of Warwick (GB))
Rizwaan Mohammed
(University of Oxford (GB))
Tamaki Holly McGrath
(University of Manchester (GB))
-
10:24
How do we close the VELO at LHCb?
-
Rizwaan Mohammed
(University of Oxford (GB))
-
10:25
Luminosity measurement and PLUME detector at LHCb
-
Eugenia Spedicato
(Universita e INFN, Bologna (IT))
-
10:26
Commissioning of the LHCb’s first level trigger
-
Alessandro Scarabotto
(Centre National de la Recherche Scientifique (FR))
-
10:27
HLT2 & Alignment and Calibration at LHCb
-
Nuria Valls Canudas
(La Salle, Ramon Llull University (ES))
-
10:28
The CMS Phase-2 Level-1 Global Trigger
-
Elias Leutgeb
(Technische Universitaet Wien (AT))