https://tinyurl.com/T1-GGUS-Open
https://tinyurl.com/T1-GGUS-Closed
https://lcgwww.gridpp.rl.ac.uk/utils/availchart/
https://cms-site-readiness.web.cern.ch/cms-site-readiness/SiteReadiness/HTML/SiteReadinessReport.html#T1_UK_RAL
http://hammercloud.cern.ch/hc/app/atlas/siteoverview/?site=RAL-LCG2&startTime=2020-01-29&endTime=2020-02-06&templateType=isGolden
During the Antares downtime, new CMS SAM tests started, including those for tape/xrootd endpoint. After the DT ended on Monday the Antares read test was failing because the files were not on buffer - Katy staged them, but have already seen them disappear from buffer. Need a way to keep them on buffer permanantly (3 files). Katy contacted Julien from the CTA team at CERN on Wednesday and hasn't had a reply at time of writing.
Another test checks 'open access' and it was found that someone without a CMS credential can stat and read CMS files from the buffer. CMS do not want this accessibiity - hence the test, which is currently failing. Looked into this with Tom Byrne and changed some permissions on the test files (as a test) but it's still failing - to be continued.
However, it appears that so long as read/write tests are green, production data can read/write too.
Katy to find out about the 'token' tests which are running and failing at all/many sites including RAL.
In addition, the gridftp endpoint test for writest to Echo has been intermittently failing in the last week. I can't see why this is at the moment.
Tape deletion campaign is planned. My estimate is that around 1.5PB will be removed from Antares.