Rogelio shows a table of relevant upcoming dates, events and deadlines:
| Date | Concept |
| Jan 12th | TSC candidate name submission to group deadline |
| Jan 23-25 | Chamonix Workshop (in parallel FCC-ee physics workshops) |
| Feb 8th | MERIT deadline for interview on 2022 objectives (for staff only) |
| Feb 8-10 | Polarization workshop (hybrid, Hiroshima University) |
| Feb 20-24 | Swiss school vacations |
| ~End Feb | FCC-ee new staff board interview |
| March 7 & 14 | Origin and Quest fellow committees |
| March 27th | LHC commissioning start-up |
| April 1st | IPAC23 peer review papers submission deadline |
| April 7th | Good Friday |
| April 23th | Origin fellow committee |
| April 24-28 | US FCC workshop |
| May 3rd | IPAC23 paper submission deadline |
| May 7-12 | IPAC23 conference |
| Jun 5-9 | FCC week in London |
| Jun 15th | Student committee (tech & doct) |
| Jun 26th | FCC-ee optics tuning workshop at CERN (tentative ~3 days) |
| Aug 29th | Origin fellow committee |
| Sep 25-29 | HL-LHC annual project meeting in Vancouver |
| Oct 10th | Quest fellow committee |
| Oct 19th | Student committee (tech & doct) |
| Nov 21th | Origin fellow committee |

and reminds that the goal for IPAC papers is to have drafts by end of February.
2023 running and beyond will be discussed in Chamonix including possible electron cloud issues in Run 4 and Stephane's proposal for a new optics in 2024 with opposite triplet polarity.
Welcome Tuuli Nissinen, who works as technical student with Felix Carlier on automatic optics monitoring.
Alignment of IR8 MBXWS,H, Riccardo De Maria, slides
New measurements from an alignment campaign of LSS8 in 2022 have been made available.
One outlier is the LHCb compensator dipole (MBXWS.1L8.E), and other MBXWS,H magnets are close to the ± 200 μm tolerance limit.
These magnets have large aperture such that the observed misalignments should not pose any issue.
Ion run plans, Roderik Bruce, slides
Roderik reminds that the 2022 Pb run for physics was cancelled and replaced by a two day ion test. The present LHC 2023 schedule foresee a one month Pb-Pb run in October. IR7 TCLD collimator installation has to wait for 11 T dipole to be installed. Beam loss minimization in the upcoming ion run relies on the backup plan of using crystal collimation, that showed promising results in the 2022 test. The beam energy will be 6.37 Z TeV or 6.8 Z TeV. ATLAS and CMS have some preference for the higher energy. ALICE and LHCb want to maximize integrated luminosity. Running at the lower energy of 6.37 Z TeV, as in RUN2 would add some margin on quench limits and stored energy and is expected to improve availability. A decision which energy will be used is expected early in 2023. The main HL-LHC upgrades for heavy ions have already been implemented and the ion performance in RUN3 is expected to already be close to the expected HL-LHC ion performance. A beta* of 0.5 m for IP1,2,5 and 1.5 m in IP8 will be used in 2023.
Luminosity leveling with separation 6.4e27cm-2s-1 in IP1,2,5 and 1e27cm-2s-1 in IP8 is planned. Physics fills are expected to last about 4 hours, therefore extending the squeeze even by 5 minutes could impact luminosity by few %. Ramp and squeeze of all IRs to about beta*=1m is the target configuration.
Review of 2018 ion optics commissioning steps, Tobias, slides
Tobias studied what has been done and learned in the 2018 ion measurements. This was not a straightforward task, since the related work appears to never really have been documented, and Tobias was not present in all commissioning stages. Roderik agreed to pursue some documentation of the 2023 ion run. There have been three optics commissioning shifts for the ion run in 2018, on 23 August, 12 September and 8 October, well before the ion run in November. The measurements were done for the squeezed optics. There have been local quadrupole and skew quadrupole corrections, waist adjustments as well as arc-by-arc coupling and global phase corrections. In the first session, a human mistake (swapping left right MQSX in IP2) happened that was fixed later. Good convergence of the corrections towards the expected optics with small residual beating was achieved at the end of the third session.
In the case of using the 2022/23 optics corrections it was mentioned that to decide if the 2022 waist shift knob should be used a calculation could be made by checking its impact
at beta*=50cm.
2018 vs. 2022 local IR1 IR5 corrections, Felix Carlier, slides
Felix started to compare the local correction knobs used in 2018 and 2022. The local corrections are obtained for proton optics and are expected to also be relevant for ion optics.
The IP1 triplet corrections in 2022 were done without corrections on Q1. Phases in segment-by-segment analysis are obtained from tracking simulations, done for beam1 and currently in progress for beam2. IP1 phase beating in 2022 in the vertical plane is similar in shape to 2018 and smaller in magnitude. In the horizontal plane the beating is small but appears to have changed in sign. In IP5 the local corrections in 2018 and 2022 are very similar in the vertical plane, and also similar in shape but smaller in magnitude in the horizontal plane.
Felix will further follow up this work and also compare the waist shift corrections. Roderik asks to extend the studies to also cover IP2, 8, however for IP2 there is not sufficient information in the proton optics measurements at beta*=10m (as presented by Tobias) and concerning IR8, there is not significant concern as beta*=1.5m.
In discussion during the meeting it was stressed that it will be important to ask (LPC+OP) for 3 shifts for heavy ion optics commissioning, scheduled well before the start of the ion physics run, as in 2018. It should be tried to have the first session already during the initial re-commissioning with beam in 2023.
Roderik + Tobias should set up a meeting shortly after Chamonix to define details of the ion commissioning with OP (Joerg et al.).