Focus on:  Hide Contributions
  • Compact style
  • Indico style
  • Indico style - inline minutes
  • Indico style - numbered
  • Indico style - numbered + minutes
  • Indico Weeks View

Choose timezone

Your profile timezone:
Use timezone based on:
Login

De-cabling preparation + Integration meetings: Outcome of the Cable Review, Status of cable identification, Layout Drawings LS3 LSS4&7 and brainstorming on the cost of the works to be done in the USC55 and RRs.

20 January 2023
CERN
Europe/Zurich timezone
  • Overview
  • Timetable
  • Contribution List
  • Videoconference

Contribution List

7 / 7
4. Outcome of the Cable Review.
Michele Modena (CERN)
20/01/2023, 10:30
De-cabling Preparation Meeting
6. Status of cable identification.
Georgi Minchev Georgiev (CERN)
20/01/2023, 10:50
De-cabling Preparation Meeting
7. Tour de table.
Georgi Minchev Georgiev (CERN)
20/01/2023, 11:10
De-cabling Preparation Meeting
8. Follow-up on EDMS document of the De-cabling/Lockout Reference List.
Miguel Navarro Baeza (CERN)
20/01/2023, 11:25
De-cabling Preparation Meeting
1. Layout Drawings LS3 LSS4&7.
João Oliveira (CERN)
20/01/2023, 11:30
HL-LHC Integration Meeting
3. Brainstorming on the cost of the works to be done in the USC55 and RRs.
Michele Modena (CERN)
20/01/2023, 11:50
HL-LHC Integration Meeting
5. Communication on future training for integration methodologies for newcomers.
Michele Modena (CERN)
20/01/2023, 12:10
HL-LHC Integration Meeting

Back to the event

CERN
Powered by Indico v3.3.7-pre
  • Help
  • Contact
  • Terms and conditions
  • URL Shortener
  • Privacy