FCC-ee injection #15

→ Europe/Zurich
CERN

CERN

    • 16:30 → 16:50
      Baseline injection scheme and costing 20m
      • (Non-exhaustive) list of hardware for the CSR

      Decision to use the Closed Bump injection for the costing exercise.

      Process of documenting items under discussion, potentially following similar structure to PBS.

       

      Costing for Injection for Booster ring and Prebooster ring in respective work packages.

    • 16:50 → 17:10
      Beam tracking simulations and error studies 20m
      Speaker: Patrick Hunchak
    • 17:10 → 17:30
      Injection region optics (4IP lattice) 20m
      • Full injection/extraction/beam-crossing configuration.
      • Failure modes and passive/active protection systems.
      • Codimd link for studies.
      Speaker: Rebecca Louise Ramjiawan (CERN)