Markus Zerlauth (CERN)20/06/2023, 08:30
-
Jens Steckert (CERN)20/06/2023, 09:00
- Baseline scheme for quench detection;
- QDS threshold definition and management;
- Monitoring baseline.
-
Dr Tomasz Podzorny (CERN)20/06/2023, 09:30
Methodology and tools for QDS Instrumentation and monitoring system tests and commissioning.
Go to contribution page -
Mr Alvaro Santiago Ferrer (CERN)20/06/2023, 10:00
- Layouts for the HL-LHC quench detection instrumentation and signals.
- Overview of the instrumentation routing.
-
Alain Antoine (CERN)20/06/2023, 10:50
- Implementation of PIC loops;
- Interfaces for HL-LHC;
- Additions for HL-LHC circuits;
- System tests and commissioning of the PIC loops and interfaces.
-
Marco Pezzetti (CERN)20/06/2023, 11:15
- Scheme required for operation of instrumentation sensors and wiring;
- Variations of the HL-LHC IT String with respect to the tunnel baseline;
- Prior tests on sensors to be briefly mentioned;
- Interlocking methods and communication with other systems;
- Methodology and tools of system tests and commissioning of the cryogenics instrumentation.
-
Jaime Perez Espinos (CERN)20/06/2023, 11:45
- Overview of the insulation vacuum and its instrumentation layout;
- Variations of the HL-LHC IT String with respect to the tunnel baseline;
- Prior tests on instrumentation to be briefly mentioned;
- Interlocking methods and communication with other systems;
- System tests and commissioning of the vacuum instrumentation.
-
Giorgio D'Angelo (CERN)20/06/2023, 12:15
Overview of the CLHS design, system testing and commissioning.
Go to contribution page -
Herve Prin (CERN)20/06/2023, 14:00
- Instrumentation sensors installation and wires connection, routing and testing;
- IFS flanges overview and validation;
- Documentation of magnet instrumentation.
-
Yann Leclercq (CERN)20/06/2023, 14:30
- Instrumentation scheme for the DCM;
- Wires connection, routing and testing;
- IFS flanges overview and validation;
- Documentation of DCM instrumentation.
-
Dr Christian Barth (CERN), Jerome Fleiter (CERN)20/06/2023, 14:50
- Overview of the cold powering system instrumentation scheme;
- Wires connection, routing and testing;
- IFS flanges and splitting modules overview and validation;
- Documentation of cold powering system instrumentation.
-
Giorgio D'Angelo (CERN)20/06/2023, 15:35
Overview of the IFS box interfaces for HL-LHC and the associated documentation.
Go to contribution page -
Jens Steckert (CERN)20/06/2023, 15:55
Overview of the patch panel and its functionalities and documentation plan.
Go to contribution page -
Mateusz Jakub Bednarek (CERN)20/06/2023, 16:15
Continuity tests, dielectric tests and other tests linked to instrumentation validation.
Go to contribution page -
Samer Yammine (CERN)20/06/2023, 16:35
- Overview of the planned ISTs and HWC tests within the String Validation Program (SVP).
- Control, Analysis and Supervision Software for the HL-LHC IT String
- MP3 data treatment during HWC
-
All participants20/06/2023, 17:00
-