LHC MD1 planning / knobs

→ Europe/Zurich
6/2-008 (CERN)

6/2-008

CERN

15
Show room on map

Availability:

Josch isn't around

Tobias/optics MD

optics MD only had Q7 variation listed. Want to consider additional configurations:

Can do some parallel studies for ML/lobster in the 2 beams. e.g. focus on Q7 in one and Q4/global corrections in the other. Then at the end do the lobster.

Tobias sees no issue scanning the arc-bump knob at the +-150% level. 

ADT is still limited to 10000 turns flattop - can we email daniel to see if can be increased? Felix and Tobias to email Daniel.

Elena/Andreas/Felix to arrange priority for trims at the end of the MD

For the failing correctors part - would be interesting to also compare the losses from linear optics style ACD kicks to see if we have a DA issue.

 

60degree planning

all good!

4 people

 

ecloud 

only on the weekend

Should mention to Gianni that it's more efficient for the nloptics at injection to be alongside the ecloud MD

 