        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        We don't have any news on the production. So far we expect them on the last week of July. 

      • 11:05
        Mesh pulsing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
      • 11:15
        ERAM gluing 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
      • 11:20
        ERAM testing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        MM1-DLC1 cannot handle 350 V. We should rescan it this week @ 340V but just a few pads which have unusual gain - already mounted and will be scanned in the next few days.

        ERAM02 - working well but there is glue inside the threads, so when we mount it on the module frame we cannot mount it because the screws are touching the back of the detector so we need to use special screws. 

        ERAM 15 - we cannot mount it on the module frame. Something wrong wrt to the alignment - we don't know if it's the stiffener or the module frame.

        We need to rescan ERAM27.

         

      • 11:30
        ERAM AOB 15m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)

        We don't have enough cards for the next batch of detectors. 

        All the cards are either already mounted on detectors in the clean room or on the bottom TPC, and some FEC cards left in the blue cupboard. 

        We need to check which cards are available in the cupboard. We might have enough for 3 detectors but for sure not for 10. Alain and David will confirm which cards are on the bottom TPC. Spreadsheet common with LPNHE about the status of all the cards:

        (to be sent by email)

        We are missing 3 stiffeners (for the detectors in the new batch)

        Guillaume - we have some stiffeners at Saclay. Suggest to take ERAM 15 back to Saclay to check the potential mechanical problem. 

         

        The chiller ran out of water - David saw some bubbles inside, which is the sign that some liquid is missing. Charlotte says there is a bottle to refill it under the desk. 

        The power went off briefly during the scan this weekend because of a fuse which went off. No major issue.

         

        Right now in the bottom TPC we have a trip for two modules at 650 V. Test of trip in air might not be entirely reliable.