LNO section meeting on LHC ADT measurements and RDT measurements in the PS
LNO section meeting on LHC ADT measurements and RDT measurements in the PS
News:
Rogelio reports that the high-beta dry run was done successfully after modifying one quad setting. Commissioning with beam is planned on Monday when Tobias will be on shift. The CMS solenoid was off yesterday with a cryogenics fault and recovered overnight. The downtime for physics was used to progress with the ion optics commissioning (incorporation of corrections during the squeeze, removal of global B1 correction due to the use of ADT compensation instead of AC dipole and optics measurements versus IR2 crossing angle). The LHC luminosity production is currently lacking behind the projected forecast. The bunch intensity will remain limited to 1.6e11. Rogelio forwards the email from Joerg illustrating that the nonlinear corrections improved lifetimes at injection (very clear improvement for b2).
3Qy RDT measurements in the PS, Wietse, slides
Wietse started his presentation with a short overview of the PS. The PS is equipped with 50 beam position monitors (BPMs) at 90 degree phase advance and a Beam Gas Ionization (BGI) Profile Monitor with a vertical dipole that guides electrons to a pixel detector. In 2021 it was observed that the BGI shielding plates introduced a significant sextupole error. New shielding plates were installed before 2022 and the resonance driving term (RDT) measurements reported here confirm this removed the issue. Optics measurements can now be done in the PS using an AC-dipole excitation and multi-turn analysis over 5000 turns and soon 60 000 turns. Singular value decomposition (SVD) techniques are used to reduce noise. The PS has 4 skew sextupoles. Their effect on optics was measured one by one and compared with the expectation using MADX tracking. Good agreement was only found after applying factors to the strengths of 6.5 to two of these and factor of -1.5 to the other two. The factor of 6.5 was found to originate in a mixup between absolute and normalized strength and has meanwhile been corrected. Aligning the turn window is crucial and was achieved using the fast extraction kicker as reference. Further measurements to verify the new 3Qy resonance driving term correction and to measure other RDTs are planned.
Putting together BBQ and regular BPMs results in a lack for reproducibility of the measured phase advance at the BBQ location. This probably reflects the difficulties of combining different BPM systems. To be followed up with more turns and to be looked at also in the LHC.
Optics measurements and limitations with ADT, Tuuli Nissinen, slides
Tuuli reports from optics measurements perfomed in the recent MD1 period. The LHC transverse damper (ADT) provides the same kind of transverse beam excitations as the AC-dipole at lower amplitude and longer excitation time that could pave the way to perform optics measurements outside commissioning and MDs. The measured beta-beat using the ADT agrees well with the AC-dipole results and the 3Qx and 2Qx lines are well visible. The tune spectra with ADT excitation show extra 50 Hz side-bands at a level of 2.e-3 not observed with AC-dipole excitation. Daniel Valuch comments that the ADT is a big analog system with long cables that might pick up a small 50 Hz component. Further measurements using both pilots and a single nominal bunch are planned for MD2 and will be prepared in collaboration with Daniel to optimally use the ADT capabilities. It could be that these sidebands dominate the noise of ADT system after the BPMs were upgraded to improve their resolution. It should be explored if this 50Hz sidebands affect emittance growth and instabilities.
Rogelio suggests to monitor the mains to see if it is the same 50 Hz as observed in the ADT sidebands.
Tobias comments that the times where 12 bunches are circulating at injection could be a good moment to perform optics measurements with the ADT.
Rogelio says he plans a discussion of ions and progress with PTC for the coming LNO meetings.