RAL Tier1 Experiments Liaison Meeting
→
Europe/London
Access Grid (RAL R89)
Access Grid
RAL R89
-
-
13:00
→
13:01
Major Incidents Changes 1m
-
13:01
→
13:02
Summary of Operational Status and Issues 1mSpeakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB)), Kieran Howlett (STFC RAL)
-
13:02
→
13:03
GGUS /RT Tickets 1m
https://tinyurl.com/T1-GGUS-Open
https://tinyurl.com/T1-GGUS-Closed -
13:04
→
13:05
Site Availability 1m
https://lcgwww.gridpp.rl.ac.uk/utils/availchart/
https://cms-site-readiness.web.cern.ch/cms-site-readiness/SiteReadiness/HTML/SiteReadinessReport.html#T1_UK_RAL
http://hammercloud.cern.ch/hc/app/atlas/siteoverview/?site=RAL-LCG2&startTime=2020-01-29&endTime=2020-02-06&templateType=isGolden
-
13:05
→
13:06
Experiment Operational Issues 1m
-
13:15
→
13:16
VO Liaison CMS 1mSpeaker: Katy Ellis (Science and Technology Facilities Council STFC (GB))
-
13:16
→
13:17
VO-Liaison ATLAS 1mSpeakers: James William Walder (Science and Technology Facilities Council STFC (GB)), Jyoti Prakash Biswal (Rutherford Appleton Laboratory)
- Survey on Computing for Analysis / Analysis Facilities: https://docs.google.com/forms/d/e/1FAIpQLScYHfpGdeifS3uN0u_jtMIRpIf_H6itQbMK5fVFG9NUBSj8gw/viewform
(https://stfc.atlassian.net/browse/GRIDPP-1463)
File descriptors (https://stfc.atlassian.net/browse/GS-131)
Two nodes in sandboxes for testingCMSD: Atlas FTS transfers tested behind the redirector; also adding writes from the WNs
-
13:20
→
13:21
VO Liaison LHCb 1mSpeaker: Alexander Rogovskiy (Rutherford Appleton Laboratory)
Tickets:
- Memory limit
- Memory limit was increased to 12GB, ticket closed
- Some jobs are still exceeding this, but the number of such jobs is very low
- DNS issue
- Redirector setup has started last week, looks OK so far
- Slow stats
- No updates
- Vector read
- Positive trend persists (2018, 2019, 2020 generations have almost no failures)
- Production testing with prefetch off should be done
- VO-box certificate
- No updates
Issues:
- A lot of failed uploads due to gateway restart on Monday
- Would it be possible to have a downtime for this in future?
- There is a constant low rate of failed downloads from ECHO to RAL's WNs
- failures mainly come from 2017 generations
- Could 'prefetch off' help?
- LHCb is draining. All sites are affected
- Memory limit
-
13:25
→
13:28
VO Liaison LSST 3mSpeaker: Timothy John Noble (Science and Technology Facilities Council STFC (GB))
-
13:30
→
13:31
VO Liaison Others 1m
-
13:31
→
13:32
AOB 1m
-
13:32
→
13:33
Any other Business 1mSpeakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB))
-
13:00
→
13:01