RAL Tier1 Experiments Liaison Meeting

→ Europe/London
Access Grid (RAL R89)

Access Grid

RAL R89

Zoom Meeting ID
66811541532
Host
Alastair Dewhurst
Useful links
Join via phone
Zoom URL
    • 13:00 → 13:01
      Major Incidents Changes 1m
    • 13:01 → 13:02
      Summary of Operational Status and Issues 1m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB)), Kieran Howlett (STFC RAL)
    • 13:02 → 13:03
      GGUS /RT Tickets 1m

      https://tinyurl.com/T1-GGUS-Open
      https://tinyurl.com/T1-GGUS-Closed

    • 13:04 → 13:05
      Site Availability 1m

      https://lcgwww.gridpp.rl.ac.uk/utils/availchart/

      https://cms-site-readiness.web.cern.ch/cms-site-readiness/SiteReadiness/HTML/SiteReadinessReport.html#T1_UK_RAL

      http://hammercloud.cern.ch/hc/app/atlas/siteoverview/?site=RAL-LCG2&startTime=2020-01-29&endTime=2020-02-06&templateType=isGolden

    • 13:05 → 13:06
      Experiment Operational Issues 1m
    • 13:15 → 13:16
      VO Liaison CMS 1m
      Speaker: Katy Ellis (Science and Technology Facilities Council STFC (GB))

      I should have mentioned a few weeks ago (perhaps missed as it was the resource review meeting?) that token (SAM) tests are now green on the AAA machines. So we can now pass token tests for both webdav and root, thanks to James W for testing and Jyothish for rolling out. Next step could be a change control in preparation for roll-out on all production gateways?

      Red day for webdav tests on Friday. 

      CMS running 8k cores, performance is excellent. Possible to raise the cap on cores back to 10 or 12k?

      DC24 pre-tests for RAL and other UK sites are in discussion. Possible 100TB test coming soon to T1 and IC, 50TB for other sites. 

      RALPP to T1 link is 'fixed' by Chris Brew - issues with firewall. Could be an issue in the future though (legacy network).

      On tape - spotted a consistent ~1.8% failure rate on transfers between Echo and Antares. Likely cause was tpc03 (1 of 4 machines) being out of action. If 3 attempts to transfer each landed on tpc03 then 0.25x0.25x0.25 = 1.56%. George fixed tpc03 and looks like the problem has gone. 

      George notified me of a very large file that could not copy into Antares due to its size (146GB). The limit is 128.8GB, but he lifted it temporarily for this one file (created in 2018).

       

    • 13:16 → 13:17
      VO-Liaison ATLAS 1m
      Speakers: James William Walder (Science and Technology Facilities Council STFC (GB)), Jyoti Prakash Biswal (Rutherford Appleton Laboratory)

       

    • 13:20 → 13:21
      VO Liaison LHCb 1m
      Speaker: Alexander Rogovskiy (Rutherford Appleton Laboratory)

      Tickets:

      • RAL->SARA transfer issues
        • Mitigation is in place (LHCONE higher priority), SARA is now accessible
        • Waiting for CERN admins to set up a proper solution
      • Redirector setup
        • No updates
      • Slow checksums
        • No updates

      Operational issues:

      • Last week we encountered a lot of vector read failures
        • See slides attached
      • Upload problems are still happening periodically
        • Gateway issues?
      • Number of running lhcb jobs is still unstable
      • LHCb dirac release on Monday, the other one should come today
        • Not without issues

       

    • 13:25 → 13:28
      VO Liaison LSST 3m
      Speaker: Timothy John Noble (Science and Technology Facilities Council STFC (GB))
    • 13:30 → 13:31
      VO Liaison Others 1m
    • 13:31 → 13:32
      AOB 1m
    • 13:32 → 13:33
      Any other Business 1m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB))