RAL Tier1 Experiments Liaison Meeting

→ Europe/London
Access Grid (RAL R89)

Access Grid

RAL R89

Zoom Meeting ID
66811541532
Host
Alastair Dewhurst
Useful links
Join via phone
Zoom URL
    • 14:00 → 14:01
      Major Incidents Changes 1m
    • 14:01 → 14:02
      Summary of Operational Status and Issues 1m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB)), Kieran Howlett (STFC RAL)
    • 14:02 → 14:03
      GGUS /RT Tickets 1m

      https://tinyurl.com/T1-GGUS-Open
      https://tinyurl.com/T1-GGUS-Closed

    • 14:04 → 14:05
      Site Availability 1m

      https://lcgwww.gridpp.rl.ac.uk/utils/availchart/

      https://cms-site-readiness.web.cern.ch/cms-site-readiness/SiteReadiness/HTML/SiteReadinessReport.html#T1_UK_RAL

      http://hammercloud.cern.ch/hc/app/atlas/siteoverview/?site=RAL-LCG2&startTime=2020-01-29&endTime=2020-02-06&templateType=isGolden

    • 14:05 → 14:06
      Experiment Operational Issues 1m
    • 14:15 → 14:16
      VO Liaison CMS 1m
      Speaker: Katy Ellis (Science and Technology Facilities Council STFC (GB))

      Katy was on holiday last week. SAM tests failed accordingly. 

      Webdav and xrootd SAM tests saw a high level of failures - see my slides.

      Testing batch farm outputs going to 'new' gateways instead of redirector gateways started at 10am today - this applies to ATLAS and LHCb who were writing back from WNs to Echo with webdav. CMS are still using gsiftp for this.

      Redirector also lost connection with one of the two IP addresses on monday - spotted and fixed quickly.

    • 14:16 → 14:17
      VO-Liaison ATLAS 1m
      Speakers: James William Walder (Science and Technology Facilities Council STFC (GB)), Jyoti Prakash Biswal (Rutherford Appleton Laboratory)

       

       

       

      • Recent Echo transfer issues:
        • Last 7 days: avg 44k HS23.
        • 30% failure rate on jobs (and walltime), ~ 90% of errors are stage-out issues.
        • 150k files queued in FTS for writes to Echo. 

       

       

      • After the success with OX, SHEF was pointed to QMUL SE yesterday. Things look better now. 

       

      • The batch farm DNS change rolled over today at 10:00 AM. 

       

      • DAOD-on-demand demo test:
        • https://docs.google.com/document/d/118ryBh628w7hSsHPUOjrKvVrnJsm4H_L0DjasvtRlR8/edit
        • Follow ups:
          • The test doesn't require special setups at sites. Want to test in real production environment, and if needed the data samples will be deleted by DDM in future regular tape deletion campaigns. 
          • In principle, there is no problem and can proceed. We are however currently  undertaking work to reduce the load on the Disk Endpoints (i.e. Echo).  Echo will be used, either via multihop, or for staging tests, it might be better to begin the tests at the start of next week, if that would be OK?
    • 14:20 → 14:21
      VO Liaison LHCb 1m
      Speaker: Alexander Rogovskiy (Rutherford Appleton Laboratory)

      Tickets:

      • Failed uploads
        • The problem is still present, there are a lot of failed uploads

      Operational issues:

      • Low number of running LHCb jobs
        • Lack of production requests
    • 14:25 → 14:28
      VO Liaison LSST 3m
      Speaker: Timothy John Noble (Science and Technology Facilities Council STFC (GB))
    • 14:30 → 14:31
      VO Liaison Others 1m
    • 14:31 → 14:32
      AOB 1m
    • 14:32 → 14:33
      Any other Business 1m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB))