Gas systems R&D activities
Live link: https://crimson-cheetah-2d3.notion.site/GCS-R-D-Activities-16-08-2023-7bae502942554316b796da891c33b80b?pvs=4
GCS R&D Activities 16/08/2023
LAB256
Done
[x] Scintillators conicidence: Test combinations of scintillators and report counting rates:
https://elogepdt-rdgas.web.cern.ch/RPC/678
https://elogepdt-rdgas.web.cern.ch/RPC/679
[x] Elog to be updated: status of chambers in lab: latest eff curve plots
https://elogepdt-rdgas.web.cern.ch/RPC/677
https://elogepdt-rdgas.web.cern.ch/RPC/682
[x] Update the DB with the state of the chambers
https://ep-dt-rpc-db.app.cern.ch/admin/content/rpcs
[x] Update resistivity in DB
https://ep-dt-rpc-db.app.cern.ch/admin/content/resistivities
TODO
[ ] To check if they were properly conditioned and where is the data from the conditioning in the elog and in grafana
[ ] RPC 18 to test it in a frame with 2.5 cm strips
[ ] Which chamber is performing best
- RPC 13 nice efficiency curves but higher currents and not very stable → conditioning?
- RPC 15 high streamers, good currents, high time resolution → dark counts, electronics?
- RPC 18 Low efficiency, rest is okay, extremely wrong time resolution → electronics?
- RPC 23 slightly higher currents → conditioning?
[ ] Tests to be performed on switching trigger between digitizer to see if time resolution changes
[ ] Use on the GIF++ scintillators as the bottom one to see if triple coincidence count is improving
[ ] Fitting function of time distribution to understand what happens to RPC 6 and RPC 18 in the past scans
[ ] Gases available to test: which and how to use them
- [ ] Test one of the HFCs like in Beatrice presentation: https://indico.cern.ch/event/716539/contributions/3245961/attachments/1799631/2934884/VCI19_BMandelli.pdf (slide 9)
904
Done
- [x] Check for installation of Vaisala for readout
- [x] Check for installation of mass flowmeter
TODO
- [ ] Table of experimental parameters to be prepared by Uzay and to be regularly updated in the elog
- [ ] Finalize tests with 10%, 7% CF4 and compare the results
- [ ] Check results together before doing any physical intervention in the setup
- [ ] Compare first with second set of measurement with the first set for 10% of CF4
- [ ] Try to fit the data without initial baseline point and compare total rate with single rate
- [ ] Check with Uzay and Arystan for installation of HF and F2 cells
- [ ] Arystan and Uzay comparison of different analysis algorithms to get the production rate and understand if it is constant over time
GIF++
Done
TODO
- [ ] Final plots to be discussed and prepared to understand the status of the aging tests
- [ ] Ohmic currents vs integrated charge
- [ ] Physics currents vs integrated charge
- [ ] Ohmic currents vs time
- [ ] Physics currents vs time
- [ ] Muon beam efficiencies for same gas mixture at different test beam (legend to report the integrated charge)
- [ ] Currents vs rate for the same gas mixture and different test beams (legend to report the integrated charge)
- [ ] Resistivity vs time
- [ ] Currents vs voltage for the source off scans (legend to report integrated charge)
- [ ] Prepare a weekly report of the plots on a static webpage in https://ghg-studies-eos.web.cern.ch/ghg-studies-eos/ + elog
- [ ] Tests GC in the elog → elog missing
- [ ] Resume daily GIF++ checklist
- [ ] Understand if there is a difference on runs performed on wed. (morning and afternoon)
- [ ] Test beam preparation
- [ ] To prepare 3 chambers from the lab: 15, 18, 23
- [ ] Test RPC 19, 21, 24 in 600 Hz trolley with STD and CO2 30% 1% SF6
- [ ] Replace all the chambers with the ones in the lab:
- [ ] Test STD, 30% CO2 1% SF6
- [ ] Possibly test Novec + 30% CO2
- [ ] Cabling campaign: in November
- [ ] O2 cells ordered
Software
- [ ] Organize the required work for a possible rewrite of the backend of olefin
- [ ] Understand how to organize gitlab
- [ ] Organize the storage of the data in a new dataframe
- [ ] For muon signals
- [ ] For gamma signals
- [ ] Signal level calculations
- [ ] Simple: simple baseline, time, charge of a peak
- [ ] To study: advanced baseline calculation
- [ ] After pulses count
- [ ] Avalanche and streamer charge integration and separation
- [ ] Try to calculate charge of each gamma signal
- [ ] Aggregating statistics calculations
- [ ] calculate features only from central strips
- [ ] Gamma cluster rate calculations