10:30
|
Quick summary on follow-up of vacuum layout + BPTQR configuration (5L and 1L sides).
-
Gema Aparicio Cantalapiedra
(CERN)
|
|
10:50
|
Electrical coffrets and minirack integration study for Vacuum needs.
-
Gema Aparicio Cantalapiedra
(CERN)
|
|
11:10
|
Status of the RF and crab cavity design: P1 new models and revision of the to-do list.
-
Julien Dequaire
Gema Aparicio Cantalapiedra
(CERN)
|
|
11:30
|
FOLLOW-UP: STRING vs. tunnel CP CL-cabling layout.
-
Paolo Fessia
(CERN)
|
|
11:50
|
Round the table: RR and USC cost evaluation.
-
Paolo Fessia
(CERN)
|