pp reference run optics commissioning and general news
LNO section meeting on the pp reference run optics commissioning and general news
News, Rogelio:
It appears now likely that there will be no polarity change in the LHC in the coming winter shutdown, to be confirmed still this month. A second leak was recently found in an IP8 TDIS bellow. At this point it is not known if and to which extend this might effect the remaining running schedule with the planned MD session. There has also been an ATLAS solenoid trip on Monday. A recommendation is expected from the currently ongoing LHCC on how much time could still be provided to finish the high-beta run, followed by the heavy ion run.
Laurent says that there is a new MAD-NG pre-release and that a pre-release link can be provided this week for interested users. The new version will be significantly faster, in some places by up to a factor seven and on average by a factor of two to three.
pp reference run optics commissioning, Tobias, slides
An pp reference optics commissioning run was performed in the night from Saturday to Sunday. The nominal beta* in IP1,5,8 is 3.1 meter and 10 meter in IP2. With a maximum beam energy of 2.68 TeV and the limited squeeze, the ramp&squeeze in the LHC cycle for the pp reference run is nice and short. The local optics corrections worked already well to the extend that the remaining beta-beat was almost acceptable even before global corrections. A more significant mismatch was observed in the beam 2 normalized dispersion before the global corrections. The external crossing angle in IP2 is increased from 170 to over 300 μrad. A very small feed-down was observed from the increase in crossing angle, both in beta-beta and coupling. Beta-beat and dispersion were well corrected after the global corrections.
Reyes comments that the choice of the crossing angle for IP2 is converging to 310 μrad, and that it is hoped that the current (TDIS) LHC limitations will allow to perform the pp-reference run as planned this year.
Rogelio says he will not be here in two weeks. The next LNO meeting is planned in one or three weeks.