RAL Tier1 Experiments Liaison Meeting

→ Europe/London
Access Grid (RAL R89)

Access Grid

RAL R89

Zoom Meeting ID
66811541532
Host
Alastair Dewhurst
Useful links
Join via phone
Zoom URL
    • 14:00 → 14:01
      Major Incidents Changes 1m
    • 14:01 → 14:02
      Summary of Operational Status and Issues 1m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB)), Kieran Howlett (STFC RAL)
    • 14:02 → 14:03
      GGUS /RT Tickets 1m

      https://tinyurl.com/T1-GGUS-Open
      https://tinyurl.com/T1-GGUS-Closed

    • 14:04 → 14:05
      Site Availability 1m

      https://lcgwww.gridpp.rl.ac.uk/utils/availchart/

      https://cms-site-readiness.web.cern.ch/cms-site-readiness/SiteReadiness/HTML/SiteReadinessReport.html#T1_UK_RAL

      http://hammercloud.cern.ch/hc/app/atlas/siteoverview/?site=RAL-LCG2&startTime=2020-01-29&endTime=2020-02-06&templateType=isGolden

    • 14:05 → 14:06
      Experiment Operational Issues 1m
    • 14:15 → 14:16
      VO Liaison CMS 1m
      Speaker: Katy Ellis (Science and Technology Facilities Council STFC (GB))
    • 14:16 → 14:17
      VO-Liaison ATLAS 1m
      Speakers: James William Walder (Science and Technology Facilities Council STFC (GB)), Jyoti Prakash Biswal (Rutherford Appleton Laboratory)
      • RAL experienced HammerCloud exclusions earlier today, back online now:
        • http://bigpanda.cern.ch/job?pandaid=6014222140
        • pilot:::1152 File transfer timed out during stage-out: hc_test:output.1.99e8b66e-b113-432e-8423-701aa2694923_58654.pool.root to RAL-LCG2-ECHO_SCRATCHDISK, copy command timed out: TimeoutException: Timeout reached, timeout=311 seconds')]:failed to transfer files using copytools=['rucio'] .
        • Also, the number of failed jobs is >10% of the finished jobs!
        • Was this due to the gateways issue? YES!

       

      •  FZK/RAL routing:
        • DDM plots attached.
        • Issue at FZK due to RAL change after the downtime? IPv6 new network -- LHCOPN related.
        • ATLAS FTS does only "pull" transfers from the source currently; the "push" is switched off (unlike CMS and LHCb).
        • Need to be discussed with the FZK-responsible over email -- GOCDB does not let one see the FZK emails, requires role!
        • James Adams could send the email?
        • A GGUS ticket is to be opened (by Brian).

       

      • No SWAP issues noticed @RAL during the past 10 days or so.
        • Anything from Tom Birkett?

       

    • 14:20 → 14:21
      VO Liaison LHCb 1m
      Speaker: Alexander Rogovskiy (Rutherford Appleton Laboratory)

      Operational issues:

      1. A lot of failed uploads today, because of the ECHO issues.
      2. Network issue between RALPP and RAL.
      3. Problems with copying files from RRCKI to RAL
        • Low speed, most probably due to RRCKI issue.
    • 14:25 → 14:28
      VO Liaison LSST 3m
      Speaker: Timothy John Noble (Science and Technology Facilities Council STFC (GB))
    • 14:30 → 14:31
      VO Liaison Others 1m
    • 14:31 → 14:32
      AOB 1m
    • 14:32 → 14:33
      Any other Business 1m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore (Science and Technology Facilities Council STFC (GB))