CPTE-October 2023

→ Europe/Zurich
Nicolas Guillotin (CERN)
Description

The main topics to be discussed :

 

1. NA62 : Control consolidation for electrical rack of the feedthroughs (logbook event 115023) / CRG-IC & ML

2.a WAT (B180) :  Consolidation of Busch recovery pump (with analyzer)

2.b WAT (B180) :  New GHe flowmeter to track gas exchanges with Central Area 

3.a HIE ISOLDE : Anticipation of maintenance for the compressor exchangers (water/oil and water/helium) 

3.b HIE ISOLDE : Water clogging due to deposit (after electrical cut - June 27)

4. SH18 : Mayekawa HP oil pressure control valve and CP start process consolidation

5. SW18 : Electrical and protection upgrade suggestion for Kaeser compressors / CRG-IC

6. A.O.Bs : 

  1. Finalization of the HIE ISOLDE diffusion pump removal system with mounting skates
  2. Feedback for Vertex 1 current leads repair ? logbook 115125
  3. Gutter installation on LP line of WAT/180 cryo station [Thierry .D]
  4. B163 anticryostat #1
  5. Reminder of former CPTE open points not yet addressed.