CPTE-October 2023
→
Europe/Zurich
Description
The main topics to be discussed :
1. NA62 : Control consolidation for electrical rack of the feedthroughs (logbook event 115023) / CRG-IC & ML
2.a WAT (B180) : Consolidation of Busch recovery pump (with analyzer)
2.b WAT (B180) : New GHe flowmeter to track gas exchanges with Central Area
3.a HIE ISOLDE : Anticipation of maintenance for the compressor exchangers (water/oil and water/helium)
3.b HIE ISOLDE : Water clogging due to deposit (after electrical cut - June 27)
4. SH18 : Mayekawa HP oil pressure control valve and CP start process consolidation
5. SW18 : Electrical and protection upgrade suggestion for Kaeser compressors / CRG-IC
6. A.O.Bs :
- Finalization of the HIE ISOLDE diffusion pump removal system with mounting skates
- Feedback for Vertex 1 current leads repair ? logbook 115125
- Gutter installation on LP line of WAT/180 cryo station [Thierry .D]
- B163 anticryostat #1
- Reminder of former CPTE open points not yet addressed.