LNO section meeting on Ion optics commissioning and arising matters

 

News, Rogelio:

Last week had the HB2023 workshop with many interesting topics and related computer codes. Rogelio showed a picture from the concert given in the gala dinner of HB2023 where Helmut was playing:

 

 

We are currently in the last two weeks of LHC operation in the heavy ion Pb-Pb run. The optics related observations of this run are the main subject of todays meeting. Further analysis and a post mortem analysis together with the NDC section are planned.
 

LHC ion optics corrections, Vittorio Ferrentino, slides

Vittorio presents the optics measurements and corrections in IP2  (ALICE) for the current heavy run, using the standard SbS (Segment by Segment) method. Corrections were applied as trims to the IP2 triplet quadrupoles (Q1 - Q3 left and right) and for Q4 in IP1 and IP5. The global corrections calculated in April turned out to be poor for B1. Decreasing the energy by trims on the orbit correctors around the ring of on average 1.6e-4 was beneficial and reduce the errors in phase advance and beta-beat. Using local corrections, the beta-beat was reduced from ~20% to below 10%. The beta-beta was measured for crossing angles of +170, 0 and -170 mum and the dependence on crossing angle found to be within tolerances. Vittorio also showed the (closed) dispersions measured for both beams and crossing polarities.

Stephane observes that the sign of the crossing angle for IP1 appears to have changed (normally negative appears now positive as visible in the LHC configuration on vistar ) and suggests to check this is real and wanted.

 

 

IR2 correction estimates using the Action and Phase Jump Analysis, Javier Cardona , slides

Javier presents an analysis of optics corrections for IP2 using the Action and Phase Jump or short APJ method ands hows his prediction for the corrections for for to trim Q2, Q3 left and right of IP2. In MAD-X, the trim strength ktqx2 is applied with a negative sign which can be confusing when comparing with signs used to shift the waist in IR2. The simulation of his proposed corrections appear to correct for the observed phase errors.

Rogelio asks how his corrections compare to what was found using the SbS method discussed in the previous talk. From a first look they appear to provide a similar correction. Javier comments that a potential advantage of APJ is that it may provide a better correction directly at the IP.

Javier asks when the next optics commissioning is planned where this method could be applied.

A good occasion would be  the re-commissioning after the proposed full polarity change for ATLAS-IP1 and CMS-IP5 that was considered for the coming winter-stop and has been postponed. Stephane says a change just of the polarity in IP1 without rotation of crossing angles and keeping the round optics with beta*=30cm (therefore no major change for forward physics) is still under discussion. 

 

Stephane shows a slide on the expected dispersion from an earlier HSS-meeting.

 

Feed-down to coupling in IR2, Ewen , slides

Ewen reminds that the D1 separation magnets around IP2 are superconducting and have a rather large b3 component that feeds down to linear coupling depending on the size and polarity of the crossing bump. In RUN1, an excellent agreement between the WISE model based prediction and observed feed-down coupling was observed. Given this good agreement, the WISE model was also used to predict corrections for the feed-down in 2018 at the reduced beta*. In the rushed commissioning in 2018, the result looked good for beam 1and less for beam 2 where it appeared to overcorrect. Measurements of uncorrected machine in 2023 again showed an excellent agreement to wise in july, but when applying the wise based correction in september very poor correction quality was obtained. Big overcorrection of LHCB2, and undercorrection of LHCB1. Some issue seen with response to MCSX correctors, but not enough to explain. Other possibility is that July meas done with only IP2 external xing, and september with the OP config (e.g. including sep bumps). Applying half of the correction minimizes the b2 coupling but under-corrects b1. This setting was left in for operation. Ewen and Rogelio regret that it was not possible to get beam time to sort out this puzzle.

 

Arising matters with ion optics, Tobias

Tobias comments on several issues noted in the ongoing ion operation.

ALICE reported very high backgrounds preventing them initially from taking useful data. It was noted that the backgrounds could be reduced by opening the tertiary collimators that are however needed to protect the triplet. After careful studies by OP+collimation team, a solution was found using a dispersion bump.

Losses occur in the ramp to an extent that beams with 1240 bunches got dumped and are currently reduced to 961 bunches. The losses appear to be most significant in the combined ramp and squeeze between 68 cm and 57 cm for beam 2. The rushed commissioning did not allow to measure and correct during the ramp and squeeze and the extrapolated trims maybe not good enough to sufficiently reduce the beta-beta and possible related losses.

Beams were dumped on several occasion by the QPS  (quench protection system) and by single event upset in electronics. Running with initially lower, levelled luminosity appears to help.

10 Hz orbit jitter is seen to enhance losses and appears to mainly originate in Q13.L8 for one dump event so far.

The lifetime at injection is poor, in particular for b1 and very tune sensitive.

So far ~1.1nb-1 were collected and 2nb-1 may be in-reach until the end of the run.

Felix comments that predicted and achieve luminosities for 2023 can be found here.

Stephane comments on bound-free pair production (BFPP and BFPP2) losses and proposes to use bumps (for BFPP2 around Q8) to mitigate losses.

 

Rogelio plans to organize the next meeting in 2 or 3 weeks, dedicated to the injectors, including LEIR and/or further follow up of what has been discussed today.

 