ERAM Meeting

Europe/Zurich
Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
    • 11:00 11:45
      ERAM status
      Conveners: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
      • 11:00
        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        46 at Rui's lab

         

        Organize a meeting with CERN in February to do an assessment of the production

      • 11:05
        Mesh pulsing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
      • 11:15
        ERAM gluing 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)

        The gluing is over

        2 stiffeners at Saclay

      • 11:20
        ERAM testing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        Remove 47 and scan 48 and then 39 (with new cards)

        Gas to be moved to the last bank

      • 11:30
        ERAM AOB 15m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)

        22/01/24 : Field cage 4 shipment to CERN

        Schedule to update for the 26/01

        Detectors to be mounted on the FC end of February and March (weeks 9-10), then tests with T2K gas outside, clean the clean room anyway, and then cosmics test.

        No electrical field on some detectors in Japan : suspiscion of connection loss on the small 2 pins connector, or the jumper? To be sure: We could add a wire between the 2 pads for the 16 ERAMs of the top TPC. We could ask CERN to add a pin on the pads to ease the connection of the wire and to avoid any issue.
        Or conductiong glue on the jumper.