Notes 9-1-2024
Présent: Matt, JLG (minutes), roberto, Melania, Rui, Kincso, Tamara, Roberto R, Roberto B, Yves, Ivan, Fernando, Francois, Rui
PC (SY-EPC)
- The power converters required for the project are for experiments(s)
- A dedicated cooling ''station'' is required for the power converter
- An EN-EL power transformer 18kV -> 400V to be added (next to the other one)
- The possibly to have water cooled cables is to be taken in consideration
- The power converter need to be installed in a separate room/ building to not mix the risks
- Investigation on the possibility to have this room attached to 918 Action - > Yves, Ivan
- 1 power converter should be replacabable in case of failure -> should under crane coverage (if fully intepend from the target complex service buidling a crane is needed)
- Power converter need to be installed on a false floor (for the routing of the utilities)
- The rounting of the PC cables could use the exiting services shafts (connecting 918 with ECN3) Action - > Yves, Ivan
Handling
- A transfer system between the curent 911 and the extension need to be forsee (trailer, platform...)
- The new door should be compatile with all the objects to be handle part of the facility
- A second door on the building extension is needed (as already integrated) if PC are kept inside
CV
- A fraction of the AHU need to be installed inside the building
- Rounting of the ventilation duct need to be forsee
- Handling of CV equipement for maintenance to take in consideration
- User requirement to be updated as input toi start the design of the CV equipment
CE
- Start drafting the IRP following preliminary discussion Action -> Kincso
- Faisability of the new door on 911 including possible need of reinforcment
RP
- Assement of the tickness of the wall(s) to be performed according to the objects being processed in the service cell and with respect to the cooling station
General
- Road enlargement requiremnet to be defined
- To be checked with Michael / Eva the location of the new EN-EL power station (BK) Action -> JLG
Next meeting in 2 weeks