    • 14:00 14:02
      Minutes and general announcement 2m
      • Thanks a lof for the chairs of the last technical meetings for chairing and writing the minutes. Will not be present but will connect remotely next week for minutes taking.
    • 14:05 14:10
      Operation Report 5m
      Speakers: Alberto Rodriguez (CERN), Eleftherios Fadakis (CERN), Emiliano Piselli (CERN), Erwin Siesling (CERN), Joachim Vollaire (CERN), Miguel Luis Lozano Benito (CERN), Simon Mataguez (CERN)
    • 14:10 14:20
      REX&HIE ISOLDE 10m
    • 14:20 14:30
      RILIS 10m

      Transfer AC RILIS

      Speakers: Cyril Bernerd (CERN), Katerina Chrysalidis (CERN), Reinhard Heinke (CERN)
    • 14:30 14:40
      MEDICIS & Building 179 10m
      Speakers: Charlotte Duchemin (CERN SY/STI/RBS), Laura Lambert (CERN), Ralf Erik Rossel (CERN)

      MEDICIS

      LAST WEEK the double Ra-224/225 collection was retrieved and shipped to Dresden (700 MBq) and NPL (110 MBq), respectively. Irradiation of #833M started.

      THIS WEEK  the irradiation of #833M continued and has been retrieved today to start with a Dy/Tb-155 collection for CHUV.

      We created a swimming pool in the S3 Bunker when putting the water on. After some tests it seems it is a target failure and not a FE failure. S3 water removal needs to be organised (S2 as well).

       

      A 1h30 irradiation slot for the irradiation of Ta samples for a release study involving the our Latvian students, the Tb-task-force and the RP-FIRIA project will happen on friday morning.

      In two weeks, the Minister of Health from Germany will come to visit MEDICIS as part of the protocol office.

       

      AOB: shared irradiation with GPS for MEDICIS

    • 14:40 14:50
      Targets, Schedule and Physics 10m
      Speakers: Hanne Heylen (CERN), Mia Au, Sebastian Rothe (CERN)

      Physics week 19

      • On GPS, the stable lead beam was very useful for preparating of photoluminiscence measurements in diamond requested by the solid state group later this year.
      •  On HRS, the Wisard experiment aims to investigate physics beyond the standard model by a high precision measurement of the weak interaction studied via the beta-delayed proton decay of 32Ar. A bit less than half of the statistics was obtained before the target change on Monday, the increased proton current was important to achieve the needed yields.

       

      Targets

      target #823

      • yields decreased over time and instabilities were seen in the total and separated beam intensities
      • heated to 300A to confirm drop in yields likely corresponding to sintering
      • proton scan on user counts: moved the proton beam down, recovered the yield. could be that the target "sank" to the bottom.
        • repeated proton scan
      • removed and replaced by target #854

      target #854

      • one day turnaround time charge preparation to loading to online and under vacuum - thanks to Valentina for fast charge preparation!
      • heavy outgassing once online
      • TODO: release curve on 32Ar yield confirmation (Sebastian and Isa)

      target #855

      • mass scan finished at offline, to be mounted on GPS 
      • proton scan on Friday TBC
        • schedule says: "11:00 Continue setup + proton scan (no yield checks on tape station)"
        • can test indium isomeric ratios on tape station if needed for RILIS setup
          • intracavity tripled TiSa, doubled dye
          • can optimize on FC490 this week once separator is setup, before central beamline
    • 14:50 14:55
      Safety 5m
      • Building 170 and 197 False Floor Inspection:
        https://edms.cern.ch/document/3078380/1
      Speakers: Alexandre Dorsival (CERN), Elodie Aubert (CERN), Nadine Conan (CERN), Simon Mataguez (CERN)
    • 14:55 15:00
      AOBs 5m
      • Validation of possibility to operate both Frontends in parallel for winter physics/MEDICIS irradiation (HRS Frontend - direct) and GPS operation. Possibility identified by Charlotte later during the year.
      • Access in the HT room in the shadow of a target change for SY-ABT and contractor (preparation of the HT safety panel consolidation)
      • Vibration measurements in flush mode in the EN-CV technical room (to schedule in the shadow of a target change)