RILIS operation from last week : Sn for ISS:
- setup done by Tuesday and first optimization on Tuesday afternoon.
- yield check with target team and optimization until Friday
- multiple calls over the weekend to try and understand the low yields and the drop in the yield. 2 interventions on site:
1/ Saturday afternoon. Intervention showed that every was nominal from our side.
2/ Sunday morning because of a computer crash in RILIS which stopped the stabilization and the camera update.
- Yield check again on Monday morning showed similar yield as Friday, without any change in the RILIS setup.
RILIS operation this week : no RILIS operation
- Cd setup will start today.
OTHER :
Chiller was repaired last week.
Laser for dye pumping switched today.