  • Upstream the merging point: items move but possibly supports can be re-used. From the merging point onwards, beamline height is different: old supports cannot be re-used.
  • MME: BI contacts MME for instrument AND support
  • We need to put everything in PLAN and then to contact MME and EN EL
  • MBG.412022 is the first magnet that does not move. Downstream of that, things move.
  • Spectrometer room will not be needed most probably.
  • After 2nd plasma cell we have the same beamline height.
  • Discussion with Vittorio needed for the 50 mm aperture of 150 MeV line.
  • Survey / alignment / integration will be part of Ans workpackage. They will need to check that existing instruments are compatible with their alignment tools
  • To be agreed what kind of budget code shall be used for new and existing supports