Legend
- This is something reported or discussed
- [ ] This is something to do
- [x] This is something done
RPC Lab 256
- All the gas from China arrived (Mattia)
- Humidifier is dismounted for the moment to be put in the new rack (Mattia, Stef)
- Review of the status of the gaps (Mattia, Stef)
- Presentation of the ECOGAS RPC6 rate measured with pad (Mattia)
- [ ] Check again the plot for the pad
- [ ] Check for charge distribution
- [ ] Start with 30% CO2 to check currents and efficiency for GIF detectors (Stef)
- [ ] Compare the efficiency with last test beam
- [ ] Compare the currents with the last HV scan done at GIF++
- [ ] HFC test: summary slides of R-32 (Stef)
- [ ] Check empty bottles to send back
- [ ] Gas bottles: check for Ar + ppm of O2 or H2O for uRWELL characterization. Not ordering now, just to check availability (Stef)
- [x] Measure the length of the removed cable from GIF to understand how long we need the new cables (Mattia, Stef)
- [x] Check for availability of Fabio for 256 installation to be continued before starting
RPC GIF
- Cables ordered
- HV connectors ordered
- [ ] Test again F- accumulation on the gas system
- [ ] To start flushing N2
- [ ] Change HV cables
- [x] Restart at GIF changing the HV module and board
uRWELL
- [ ] Finish commissioning of mixer/gas system and monitoring
- [ ] Perform initial HV scans with premixed bottle
- [ ] Start using the available radioactive sources
- [ ] Check with RP the implications of having an X ray gun
GLASS RPC
- [ ] Make a summary of the material needed to build them
ISE R&D
- [ ] Take the material from 904
- [ ] Follow up measurements of ATLAS RPC
uLOOP
- [x] Check with Pieter and Stef the code
- [x] Order the cheap filter ⇒ price quotation requested
- [ ] Start drawing the electrical schema for Jonathan (Stef)
- [ ] Mechanical support to be used for EEE (Pieter, Stef)
- [ ] Ask Daniel which humidity sensor they have in DT (Gian)
- [ ] Check the filters for the Tracker GC in CMS (MCA)
- [ ] Set meeting with David
Analyses
- Modifications done on the CMS GC Tracker
- ISE measurements in ALICE: agreement on organization. Two times a week, with help from MID people when the system is working fine
- ALICE and CMS calibration bottles ordered for RPCs (4.5% isobutane only one available)
- [ ] Check alternatives to Emerson for IR ⇒ Stef, MCA
- [ ] Discuss with Ivan about presenting to the CMS mechanics conference
- [ ] LHCB RICH1 check the results about the tests of how much Air was present during the purifier emptying
- [ ] Software related: publish data from ALICE MID GC
- [ ] ISE measurements in ALICE: start couple of weeks before the run for having a reference
- [ ] Follow up with Florian for UV-VIS analyses
Recuperation systems
- Review of the SF6 recuperation
- [ ] Check at which temperatures one should operatee the R-134a recuperation system if we recover the 87 ln/h of
- [ ] How much energy is required to recuperate a certain amount of SF6
- (Related also to Analyses) CSC CF4 recovery still off because there is ~3% of Air (MCA)
- [ ] Check if between 2022→2023 the Air amount was as current YETS
- [ ] Check if 3% of Air is only N2 or also O2. The purifier should remove O2
- [ ] Once analysis is done to publish on analyses websites
- [ ] Restart the R-134a one on Monday ⇒ ALL
- [ ] HF test with recuperated R-134a to be done
- [ ] Test absorber 13X for SF6/N2 separation (MCA)
Other
- GCMS: problems in connecting from PC. Ip address changed
- [ ] Mixer from ETH ⇒ sending a volume filled instead
- [x] Review the status of the humidifiers (linked) with GIF task above)
- [x] Check humidifier rust in other humidifiers at GIF and in MID ⇒ ASAP
- [ ] Check CPV water and eventually go with the endoscope
- [ ] For the moment, stop using Festo
- [ ] Ask LPh for help to clean up 256 and organize the space
Novec humidity test setup
Summer student:
- One for RPC, strong software skills: copy and paste. one Mattia, second to check
- Recuperation and gas analysis: MCA and Damiano
- Possibly one for uloop and monitoring tools for gas systems: Pieter, Gianluca
Software (from old meeting)
- [ ] Organize the required work for a possible rewrite of the backend of olefin
- [ ] Understand how to organize gitlab
- [ ] Organize the storage of the data in a new dataframe
- [ ] For muon signals
- [ ] For gamma signals
- [ ] Signal level calculations
- [ ] Simple: simple baseline, time, charge of a peak
- [ ] To study: advanced baseline calculation
- [ ] After pulses count
- [ ] Avalanche and streamer charge integration and separation
- [ ] Try to calculate charge of each gamma signal
- [ ] Aggregating statistics calculations
- [ ] calculate features only from central strips
- [ ] Gamma cluster rate calculations