Legend
- This is something reported or discussed
- [ ] This is something to do
- [x] This is something done
Maintenance
Recuperation systems
- Presentation of Amin
- [x] How much energy is required to recuperate a certain amount of SF6
- [ ] Exercise: do estimation of power consumption also for R-134a
- [ ] Exercise: estimate real consumptions
- [ ] Check at which temperatures one should operate the R-134a recuperation system if we recover the 87 ln/h of
- Discussion about low pressure and high reflux ratio
- [ ] Electrical part to be finished and control system tested (Patrick, Andrea, Gianluca)
- Presentation of MCA
- [x] Check if 3% of Air is only N2 or also O2. The purifier should remove O2
- [x] Once analysis is done to publish on analyses websites
- [ ] Check if between 2022→2023 the Air amount was as current YETS
- [x] Restart the R-134a one on Monday
- Issue with R-134a recuperation on column 2, 3 not filling
- [ ] Increase the temperature for the weekend and keep high flow
- [ ] Test absorber 13X for SF6/N2 separation (MCA)
- [ ] Check of using 256 RPC mixer to do the tests
RPC Lab 256
- [x] Check empty bottles to send back
- [x] Gas bottles: check for Ar + ppm of O2 or H2O for uRWELL characterization. Not ordering now, just to check availability (Stef)
- [ ] For each bottle check the price (Stef)
- [ ] Mixer check for speeding
- All the gas from China arrived (Mattia)
- Humidifier is dismounted for the moment to be put in the new rack (Mattia, Stef)
- Review of the status of the gaps (Mattia, Stef)
- Presentation of the ECOGAS RPC6 rate measured with pad (Mattia)
- [x] Check again the plot for the pad
- [x] Check for charge distribution
- [ ] Start with 30% CO2 to check currents and efficiency for GIF detectors (Stef)
- [ ] Compare the efficiency with last test beam
- [ ] Compare the currents with the last HV scan done at GIF++
- [x] HFC test: summary slides of R-32 (Stef)
- [ ] Check about re-oiling ECOGAS RPC 6
Analyses
- Test on RICH2 purifier done (MCA, Pieter)
- [ ] ISE measurements in ALICE: start couple of weeks before the run for having a reference (MCA, Mattia)
- [x] Check alternatives to Emerson for IR ⇒ Stef, MCA
- [ ] Discuss with Ivan about presenting to the CMS mechanics conference
- [ ] LHCB RICH1 check the results about the tests of how much Air was present during the purifier emptying
- [ ] Software related: publish data from ALICE MID GC (Gian, PIeter)
- [ ] Follow up with Florian for UV-VIS analyses → Gian to send invitation
Other
- [x] Ask LPh for help to clean up 256 and organize the space
- [x] GCMS: problems in connecting from PC. Ip address changed
- [ ] Mixer from ETH ⇒ sending a volume filled instead
- [ ] Check CPV water and eventually go with the endoscope
RPC GIF
- Cables ordered
- HV connectors ordered
- [x] Test again F- accumulation on the gas system
- No difference in F- accumulation at GIF
- Accumulation was not 0 before christmas ⇒ there was the humidifier
- [ ] To start flushing N2
- [ ] Change HV cables ⇒ waiting to resolve
- [x] Restart at GIF changing the HV module and board
uRWELL
- [x] Finish commissioning of mixer/gas system and monitoring
- [ ] Perform initial HV scans with premixed bottle ⇒ start with premixed bottle with CF4
- [ ] Start using the available radioactive sources
- [ ] Check with RP the implications of having an X ray gun (Stef)
- [ ] Check for the reading of the signal
GLASS RPC
- [ ] Make a summary of the material needed to build them
ISE R&D
- [x] Take the material from 904
- [ ] Follow up measurements of ATLAS RPC
uLOOP
- [x] Check with Pieter and Stef the code
- [x] Order the cheap filter ⇒ price quotation requested
- [x] Start drawing the electrical schema for Jonathan (Stef)
- [x] Mechanical support to be used for EEE (Pieter, Stef)
- [ ] Ask Daniel which humidity sensor they have in DT (Gian)
- [x] Check the filters for the Tracker GC in CMS (MCA)
- [x] Set meeting with David
- Ordered luminox
Novec humidity test setup
Software (from old meeting)
- [ ] Organize the required work for a possible rewrite of the backend of olefin
- [ ] Understand how to organize gitlab
- [ ] Organize the storage of the data in a new dataframe
- [ ] For muon signals
- [ ] For gamma signals
- [ ] Signal level calculations
- [ ] Simple: simple baseline, time, charge of a peak
- [ ] To study: advanced baseline calculation
- [ ] After pulses count
- [ ] Avalanche and streamer charge integration and separation
- [ ] Try to calculate charge of each gamma signal
- [ ] Aggregating statistics calculations
- [ ] calculate features only from central strips
- [ ] Gamma cluster rate calculations