Choose timezone
Your profile timezone:
PbPb13 EPOS 16_053 v1r21p3-el9 Production, ~9.1M
TODO in PbPb13
From 160-200 events per .hepmc file, around ~80 survive as BeamSimulator sampling from shoe file gives a beam that does not hit Pb target -- 1cm in diameter.
Beam shoe was created with: T1 cut (see ~/MC/PbPb13MC/ExtractBeamSHOE), one Upstream BPD can miss, +- 25 microseconds WFA S11 cut, MainVertex z cut (+-1cm)
-------------------------------------------------