RAL Tier1 Experiments Liaison Meeting

→ Europe/London
Access Grid (RAL R89)

Access Grid

RAL R89

Zoom Meeting ID
66811541532
Host
Alastair Dewhurst
Useful links
Join via phone
Zoom URL
    • 14:00 → 14:01
      Major Incidents Changes 1m
    • 14:01 → 14:02
      Summary of Operational Status and Issues 1m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore, Kieran Howlett (STFC RAL)
    • 14:02 → 14:03
      GGUS /RT Tickets 1m

      https://tinyurl.com/T1-GGUS-Open
      https://tinyurl.com/T1-GGUS-Closed

    • 14:04 → 14:05
      Site Availability 1m

      https://lcgwww.gridpp.rl.ac.uk/utils/availchart/

      https://cms-site-readiness.web.cern.ch/cms-site-readiness/SiteReadiness/HTML/SiteReadinessReport.html#T1_UK_RAL

      http://hammercloud.cern.ch/hc/app/atlas/siteoverview/?site=RAL-LCG2&startTime=2020-01-29&endTime=2020-02-06&templateType=isGolden

    • 14:05 → 14:06
      Experiment Operational Issues 1m
    • 14:15 → 14:16
      VO Liaison CMS 1m
      Speaker: Katy Ellis (Science and Technology Facilities Council STFC (GB))

      DC24 has started! CMS/RAL rates are a bit up and down according to FTS monitoring but in general we are hitting the expected rates so far.

      OPN is still down. LHCONE is showing zero traffic IN but we think this is monitoring problem.

      SAM tests weren't running over the weekend. RAL was lucky that we remained green. Jobs continued but some periods of high failure rate and low efficiency (several days from 9th Feb). Possibly due to OPN being missing.

    • 14:16 → 14:17
      VO-Liaison ATLAS 1m
      Speakers: James William Walder (Science and Technology Facilities Council STFC (GB)), Jyoti Prakash Biswal (Rutherford Appleton Laboratory)
      • DC24 and RAL:
        • Live notes.
        • FTS monitoring link.
        • RAL had a massive drop (yesterday around 15:00 hrs) that is not understood -- something wrong with injection (plot attached)? 
        • RAL without cancelled jobs has mainly token errors -- not clear if it is correlated with the drops in transfers which was quite dramatic.
        • Off the tokens now. 
        • In general, the DC24 traffic for ATLAS went down because of the volatile data at the source and the system deleted it.

       

      • RAL-LCG2_MCORE is back!

       

      • Update of RAL storage pledge by 2 PB (Twiki has the procedure).
        • Could not make the change due to several permission issues!
        • Was hoping it to be taken care of by the Data Services team -- not done yet.

       

       

      • Status of Antares to Echo data transfers that started on Monday? 

       

    • 14:20 → 14:21
      VO Liaison LHCb 1m
      Speaker: Alexander Rogovskiy (Rutherford Appleton Laboratory)

      DC24:

      • Good efficiency for both RAL links (T0 -> ECHO and ECHO ->Antares)
      • T0 -> ECHO link has lower throughput than expected
        • around 2.5GiB/s, while 4 is the desired value
      • Second link is much faster, but starving sometimes

       

    • 14:25 → 14:28
      VO Liaison LSST 3m
      Speaker: Timothy John Noble (Science and Technology Facilities Council STFC (GB))
    • 14:30 → 14:31
      VO Liaison Others 1m
    • 14:31 → 14:32
      AOB 1m
    • 14:32 → 14:33
      Any other Business 1m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore