People : Francesco Filippini, Miles Lindsey Clark, Cédric Vérilhac, Diego Real, Stéphane Colonges
Begin : 10h35
-Colmar and Telesub Lanterna visit : Stéphane and Giogio Riccobene.
Major issue observed : Air bubble in the Gisma connector moding ==> induce short under water
see :
https://docs.google.com/document/d/1nCHEbGHKRQfr7cr2mOlbClRPEv0UpAop/edit
Giorgio will ask to receive 26 hydrophone before july (necessary for next ARCA sea op)
-Tecnint clb V2 and V4 V
50 will sent to IFIC calib
50 to Salerno
Wait for photo or new proposal for packaging before sending to IFIC.
Marco is in contact.
Miles mention this becomes urgent
-Testbench :
Diego has reviewed the documents. Francesco will also have a look:
https://docs.google.com/document/d/1muYikVUBfDD1o_uNoeG2t3ZZNw84Fz8bukePWZDWxjc/edit
Question : Salerno prepare a calibration robot. It could be the opportunity to discuss in the future the calibration to the CLB manufacturing side? (less handling, save time and ressources)?
Goal : send document and discuss in april with tecnint for proposal
-Coilcraft transformer for FMC : TTWB3010-1 ==> Giuliano will ask a sample
-PBS SW FW ==> Mail sent by Cédric. To be discussed with Cristiano for improvment proposal to manage firmware configuration tracking
Golden image risk/issue: Last Monday meeting with Nikhef to add security on the SW side not in FW site ==> discussed with EMIDIO
List issue of golden image work in progress with tomaso
-RAMS and Fides studies : for infradev we will now spread into 2 reports:
KM3NeT_DET_2021_001_Reliability&availibility_Analysis => board electronic fides report
and
KM3NET_DET_2024_001_RAMS_REPORT ==> RAMS report ==> infrastructure availability, reliability improvments actions, FMECA, field failure analysis
-Jan Willems has sent new White rabbit Backplane design to stéphane for Fides analysis update (Finisar version)
-Reliability requirement: ask 5% / 20 years for product reliability
-Diego will send to Tecnint CLBV4 (90?) from Rompal for octopus connector insertion ==> Diego will open a SRS
-CLBV4 and PBV4 microsection et prod apres CLBV2 ==> in progress ==> planned for march 18th
-MDP : PMT base manufacturing data package discussion planned on 18/03/24 with Pasquale Migliozi, Stéphane, Cédric
-Stephane Contact KVI to ask gateware design for octopus CPLD and also schematic, software, firmware for Octopus testbench
Contact : Hevingo@kvi.nl Michel
End 11h42