PMT base manufacturing

Europe/Zurich
Description

https://u-paris.zoom.us/j/86349048549?pwd=aTZlQWR6bWI3elZBR1RHUGRkVkdFdz09

 

discuss with you about the manufacturing:
 
-What are the documents sent to the manufacturers
-What are our requirements? / Tender (to know requirements)
-KM3NET procedure (for PMT base assembly + HASS/ESS and for PMT + Base soldering)
-Manufacturer procedures
-Certificates of Conformance - ESS reports, and test reports from the manufacturer
-How much have been produced?
-What is the manufacturing status ==> manufacturing batches in progress, next batches... and quantities
-How components obsolescence are managed? Do the manufacturer has that raised risk of obsolescence in the Bill Of material?
-Do you have a contact with the designer team (Nikhef) about design changes when necessary?
-I will also be interested to have a PMT base PMT (nude) + one with components soldered in order to perform a micro-section analysis of the PCB : indeed, if the quality is not conform to IPC class 2 (would prefer class 3), we have a risk to introduce a catalectic failure or a degradation (noise, loss of performance...). We have also detected several fragility on the flex cable of the PMT base (flex broken during integration). We need to better understand this fragility.
(cf mail 29/02/2024 - PMT Bases)
The agenda of this meeting is empty