Notes from last meeting
AMBER APX Safety Meeting – 01.03.2024
Explosion Risk assessment
Iqra (HSE),
Moritz, Oleg (AMBER),
Letizia, James, Evelyne (EP Safety Office),
Sylvain (EP-DT)
Boris (BE-EA),
Piotr Podlaski (EP-SME)
Explosion Risk Assessment Review
https://edms.cern.ch/document/1214925/2024
Additionnal points :
- Certificate pressure sensor -> Moritz
- Scaffolding will be removed after the calibration by Didier Gonnard
- Zonage of the crane to be organized à Action Moritz / Evelyne
- Filling procedure + description of the system cryo -> Moritz / Johan
- Flexibles used for IKAR TPC to exchange/re-calibrate (not compatible with the current pressure) Moritz – David
- Test de pression (David, Johan, Didier)
- Test safety valves – Didier
- Leak test -> ?
- Procedure in case of access on the tank level if no scaffolding -> Moritz
- Xray test ? (mechanical part) David J. confirmed ?
- Needed time for the purge of the system in case of problem ?
- Cold mode 50% buffer + 50% system
- Which type of evacuation ?
- PLC : Which actions from EP-DT ? To be defined in the action matrix, meeting next week.
Diode test – to be organized, discussion next week (which happened today); details to be confirmed and test scheduled with Cryo.
- Operational procedure for purge pump -> who ?
- Specify Deuterium in the related document
- Visit with FB to organize – Evelyne
- How to evacuate the H2 in the hall for FB?
- Ask to Jani Lehtinen status for HVAc in B.888 -> Evelyne
- FB : Procedure – visit on site ?
- Use of Nitrogen – Needs documentation -> Evelyne to see safety file in AMBER context