      Top of the meeting discussion 10m
      Speakers: Fred Luehring (Indiana University (US)), Robert William Gardner Jr (University of Chicago (US)), Shawn Mc Kee (University of Michigan (US))
    • 10:10 → 10:20
      TW-FTT 10m
      Speakers: Felix.hung-te Lee (Academia Sinica (TW)), Han-Wei Yen
    • 10:20 → 10:30
      AGLT2 10m
      Speakers: Philippe Laurens (Michigan State University (US)), Shawn Mc Kee (University of Michigan (US)), Dr Wendy Wu (University of Michigan)

      CVMFS:
      2 ggus tickets for job failures caused cvmfs problems on work nodes.
      Both from the wrapper not being able to fetch the pilot.
      We keep seeing work nodes having cvmfs pilot issues, and handing them to cvmfs experts for investigation

      EL9 status:
      51% WN cores in EL9

    • 10:30 → 10:40
      MWT2 10m
      Speakers: David Jordan (University of Chicago (US)), Farnaz Golnaraghi (University of Chicago (US)), Fengping Hu (University of Chicago (US)), Fred Luehring (Indiana University (US)), Judith Lorraine Stephen (University of Chicago (US))
      • Downtime on 6/10 for updating critical storage elements to el9
      • GGUS Ticket 167105 about low transfer efficiency is some aftermath of the downtime upgrade.
        • Should be fixed now
      • Continuing to work on upgrading services at IU and UC to el9
        • worker nodes 100% complete
        • >90% complete with head services
      • UIUC preventative maintenance on July 10
    • 10:40 → 10:50
      NET2 10m
      Speakers: Eduardo Bach (University of Massachusetts (US)), Rafael Coelho Lopes De Sa (University of Massachusetts (US)), William Axel Leight (University of Massachusetts Amherst)

      Operations

      • Investating why EI jobs fail at NET2. They start but process is idle and does not use CPU. Same phenomena observed in other sites.
      • Other than that, good week. No major interruptions, around few (~5%) nodes down in maintenance.

       

      Devel

      • 2024 procurement (9 servers): 6 ready for production, 1 being used for testing, 2 in investigating issues with vendor.
        • These are much much bigger servers. We are still optimizing the network configuration for them.
        • Should be in production shortly.
      • Working on tape deployment. Good discussions during S&C week.
      • Major delays from Ciena.  Network gear no longer expected in June. We will renew with NoX for a few months. NEREN transition delayed until Sep/2024.
        • Very unfortunate, and somewhat major disruptions in MGHPCC plans. But outside our control.
    • 10:50 → 11:00
      SWT2 10m
      Speakers: Horst Severini (University of Oklahoma (US)), Kaushik De (University of Texas at Arlington (US)), Mark Sosebee (University of Texas at Arlington (US)), Zachary Thomas Booth (University of Texas at Arlington (US))

      OU:

      • Nothing to report, running well.
      • Failures earlier were related to bad compute node, reimaged.

       

      SWT2_CPB:

          1. Support for tokens in the XRootD proxy machines has been enabled
          2. Investigating cluster load issues for certain workloads (i.e., group production)
          3. CVMFS issues are intermittent, but may correlate with these types of jobs
          4.Thinking about a new system for putting nodes excluded by slurm / NHC back online