POLAR-2 weekly meeting

Europe/Zurich
Description

Zoom info:

https://unige.zoom.us/j/63634520102

 

  • FEE Mechanics update
  • FEE FW HV + Peltier 
  • FEE physics part
  • Updates on WP3 and WP4
  • FW for LVPS hub
  • ESRF beam test
  • Simulation and analysis

 

 

 

 

 

 

 

 

 

Management

  • ESA talking to Scionix about ordering
  • CSU meeting on BEE.
  • CSU provided two documents that need Philippe and Johannes will need to iterate through
  • not much news from IHEP (besides updating documents)
  • Polish submitted documents to ministry. More details requested.

 

Modules

  • no update

 

FEE

  • problem found in the firmware. Adrien solved the bug but the solution is badly implemted (buggy)
  • communication stutters sometimes (reproducible)
  • previous firmware was very good (almost done) but current version has some issues
  • still issues on Zynq board. Dominik swamped with documentation. Nicolas

 

BEE/PSU

  • PSU documents submitted for the review
  • BEE documents ready to submit
  • availability from 18th of April. Philippe coordinating this.
  • Yannick proposed a workshop to evaluate worst case scenario (independant of review)

 

Mechanics

  • Franck will provide updated contstraints based on CSU meeting
  • Franck needs to define the functional blocks
  • Johannes will follow-up with Franck about this
  • CSU willing to reduce the price of Comm box
  • quote for dummy modules
  • quote for mechanical pieces (larger items)

 

-------- No meeting on April 1st (Easter) --------

 

Action Items

AI1: Philippe and Johannes fill technical documents

AI2: Nicolas will work on Zynq board

AI3: Philippe and Johannes update quotes with Franck for CN