Plunger review - follow up

Europe/Zurich
6/2-008 (CERN)

6/2-008

CERN

15
Show room on map
Zoom Meeting ID
67146017479
Host
Marlene Turner
Useful links
Join via phone
Zoom URL

Present: Michele Bergamaschi, Fern Pannell, Arthur Clairembaud, Marlene Turner, Patric Muggli, Nikita Zena van Gils, Luca Ranc (zoom)

 

Discussion points:

  • Three positions of screens: out/in beamdump/in screen
  • Should there be a double foil or two separate foils? fluence, beamsize and more spot considerations. If single foil, one needs to ensure that reflection is dumped in a safe place.
  • Estimate ~4000 events per plunger
    • may need high statistics to pull signal out, events to be designated carefully
    • need to find energy. PM: there we need to have a clear strategy. Maybe start at 10m, then decrease slowly to guess energy range.
    • injection efficiency needs to be close to 100%
      • there will likely always be an unknown at where injection actually occurs.
  • Spectrometer magnets can only be set to image in one plane when the plasma ends earlier than 9.5 m
  • Screen retraction, screens retract towards aisle side, but still stick in--> laser will cause diffraction
    • proton beam halo may also interact with holder and cause additional background
    • shimming is an ~1hr intervention
  • May plungers be used to study e-beam/plasma interaction?
    • when laser beam dump is inserted upstream, screen will block e-beam
  • Spectrometer background
    • to be studied carefully during the SSM run (including changes)
    • biggest worry is that signal wont be visible
    • should know beforehand where optimum electron beam positions on the screen are. trade off between dispersion and background.
There are minutes attached to this event. Show them.
    • 1
      r
      Speakers: Fern Elizabeth Pannell (University of London (GB)), Fern Pannell (University College London), Dr Michele Bergamaschi (Max-Planck-Institut für Physik/CERN)