TMD:
To check the problem with the furnace in H2, looking for leaks and contamination.
To check if somebody from TMD is in the Paris meeting (16-19/04/2024) – Fresh information, nobody from TMD is in Paris meeting, so the only option is to send the parts by agency.
Explore the best way to send the parts with the less possible delivery time. Advice denominate the parts as samples with no commercial value (which they are) can speed up the customs process.
Give the team an estimation for the vacuum furnace reparation, with an eye on the full stack assembly.
COMEB:
Check if they have the ABA material necessary for the reparation.
Follow the aluminium box situation to deliver it to TMD.
VDL:
Measure the distance of the grooves for the coupler in prototype 2.
If the distance obtained is less than two mm, one on each side, they will propose the team a possible viable solution in the next meeting.
Start machining of the prototype 2.
Adapt the design of the WG to the COMEB demands in the extremities, adding more brazing material and moving the wire position to the edge.
CERN:
ELETTRA: