Attending: Paz Alonso Arias (PAA), Nuria Catalan Lasheras (NClH), Chiara Marrelli (CM), Matteo Volpi (MV), Walter Wuensch (WW), Igor Syratschev (IS), Lee Millar (LM), Carmello Barbagallo (CB), Olivier Brunner (OB), Zaib um Nisa (ZN)

 

Xbox2

We have reached 50 MW. PAA asks if she should keep pushing up or change the pulse length. NClH asks what is nominal conditions, confirmed its 72 MV/m unloaded (nominal input power of approx. 60MW).

WW says to try to achieve Nominal input power, then increase pulse length. 

IS comments on klystron pulse (PKI). It looks a little bad shape, PAA to check rf pulse alignment with hV pulse.

Xbox3

Vacuum in waveguide still going down (around 5e-8mbar). PAA confirms vacuum acquisition and interlocks with PXI is fixed, but no vacuum conditioning (for loads). PAA to contact Labview support to check this. NClH asks LM about machine learning project – when was this? PAA comments it was around 2020 according to Marca. NClH says that maybe something is changed in the code. LM confirms this was Xbox3, he will look into data with his own code.  

CM and PAA report on ion pump controllers problem. Found that cables were in bad shape --- Alan fixing it --- but that means we were running klystrons without vacuum for months now. NClH considers if Scandinova should have checked this. CM asks why this type of connectors. NClH answers connectors of Xboxes are put by Scandinova.  MV wonders about their controllers, he will check his own cables and connectors.

KLY A internal pressure is 50uA. NClH hopes it will recover through the line (currently Sergio is pumping the line)

IS says that if klystron on the right is ok, we can continue measuring. PAA says she will need to bypass the interlocks regarding KLY A to do so, but otherwise, no problem. 

Melbox

Almost finished bead pull setup, and done power calibration. MV meas. all directional couplers, less coupling than at CERN (done with screws, not clams).

 Applied calibration, same as before. Down in power due to cluster of BD. Lines are very short, vacuum spike shown in other line (correlation). 

Looking for nice buncher now. NClH says to fabricate one.  Bought milling machine, maybe possible. 

MV asks if connecting structure before conditioning line. NCLH said they first did condition line and then structure, but it took so long, they decided to install structure directly. Probably PC is still not conditioned though. NClH says to put structure. WW asks what happens if he runs flat for a while. 

MV asks why PKI follows PSI for some time in PC BD. IS says it seems one cavity became active (detuned?) at wrong freq. when BD, not always.

 

 

 

 

 