HL-BSR carrotage discussion

Europe/Zurich
Description

Bonjour,

 Comme discute avec Guillaume, l’idee de cette premiere discussion est de comprendre ce qui est techniquement possible de faire dans le LHC entre les UA et les RA pour pouvoir passer nos lignes optiques.

Salutations

Stephane

Registration
Participants
Participants
  • Chiara Pasquino
  • Christophe biot
  • Daniele Butti
  • Federico Roncarolo
  • Stephane Burger
  • William Andreazza

Project/slides presented: optical lines from UA43 to RA43 (and UA47 to RA47).

Optical line simulations are ongoing. 

  • Option1: complex line around the mono rail to use the existing carrotage
  • Option2: Go straight (from above the mon rail was actually discussed)
  • Option3: trench all along the way up to the new hutch

 

Christophe needs to perfom scans to make sure there is no 'pipes' in the depth of interest (~200mm). 

--> try to launch them for next TS

--> William to give the DCUM for both sides: UA43/RA43 & UA47/RA47 (from ECR: final position will be confirmed).

 

 

 

 

   

There are minutes attached to this event. Show them.
The agenda of this meeting is empty