PUMA-RC6 Survey and Alignment

→ Europe/Zurich
508/1-001 (CERN)

508/1-001

CERN

20
Show room on map

Attendees: 

Oliver Aberle, Erwin Siesling, Alberto Martinez De Zuazo Martinez, Nicholas Chritin, Antje Behrens, Alexandre Beynel, Lukas Nies

Talking points:

  • Layout of RC6 beamline
  • Survey results of existing elements
  • Beamline sectioning
    • Combining different elements on shared mount with independent alignment options
  • Discussion with the alignment team for the type of targets to use for the DB tanks and type of aligning table.
  • Discuss the need of bellows upstream and downstream the DB tanks (hydroformed preferred, EWB if too limited in space)
  • Alignment of electrodes of HV transfer beamline part inside vacuum vessels 

Minutes

  • general design is discussed different sections for alignment are proposed by LN:
  • After floor is reworked, survey team would like to install reference points, which should not be obstructed by the high-voltage cage or other installation
  • First QP doublet: check if support can be reused
  • Second QP doublet: check if support can be found
  • Nicholas will contact Vincent Barozier for the existing ISOLDE QP designs
  • Standard QPs at ISOLDE are aligned based on their major flange, will be done here as well
  • Target holders for aligment: design will be shared by Nicholas once the design is ready
  • New DBs:
    • HIE-ISOLDE DBs alignment procedure will be reused as from existing design
    • Instruments inside the vessel are aligned either directly with the survey team, or the vessel itself will be aligned assuming instruments inside the vessel are aligned by installation
  • Section 1:
    • Reuse old mount if possible
    • Valve will be ISO standard, following drift tube will be adapting ISO on one side to CF on the other side -> design needed
  • Section 2: 
    • DB and QP to be independently alignable, will require moving DB a bit downstream and QP a bit upstream to fit hydroformed bellows
    • Ideally, shared mount with independent tables for alignment 
    • How much misalignment can the hydroformed bellows take? About +-1mm 
  • Section 3: 
    • Align electrodes with respect to center flanges and then align vessel with respect to center flanges -> adapter to mount targets inside electrodes to be designed
  • Section 4 & 5: MIRACLS hardware, to be aligned with theodolite as was done before. Support to be designed by EP-SME-IS (Lukas)
  • Section 6: same as section 3
  • Section 7: Straight flanges on DB, bellows will not be welded directly to the DB. Stiffness of ZQNA Elena QP support structure to be checked.
  • Section 8: to be combined with section 9?
  • Section 9: 
    • Mapping and aligning switchyard electrodes to be discussed. Disassembly planned for 29th of May. 
    • Kicker will be fixed with respect to the vessel, only bender to be aligned -> procedure to be found
  • Section 10:
    • Similar to section 7
  • Section 11: only DB, ends in a vacuum valve, no bellow between 
  • For handover points: no bellow on the downstream side of DBs, as valve has to be supported by DB itself