Attendees:
Oliver Aberle, Erwin Siesling, Alberto Martinez De Zuazo Martinez, Nicholas Chritin, Antje Behrens, Alexandre Beynel, Lukas Nies
Talking points:
- Layout of RC6 beamline
- Survey results of existing elements
- Beamline sectioning
- Combining different elements on shared mount with independent alignment options
- Discussion with the alignment team for the type of targets to use for the DB tanks and type of aligning table.
- Discuss the need of bellows upstream and downstream the DB tanks (hydroformed preferred, EWB if too limited in space)
- Alignment of electrodes of HV transfer beamline part inside vacuum vessels
Minutes
- general design is discussed different sections for alignment are proposed by LN:
- After floor is reworked, survey team would like to install reference points, which should not be obstructed by the high-voltage cage or other installation
- First QP doublet: check if support can be reused
- Second QP doublet: check if support can be found
- Nicholas will contact Vincent Barozier for the existing ISOLDE QP designs
- Standard QPs at ISOLDE are aligned based on their major flange, will be done here as well
- Target holders for aligment: design will be shared by Nicholas once the design is ready
- New DBs:
- HIE-ISOLDE DBs alignment procedure will be reused as from existing design
- Instruments inside the vessel are aligned either directly with the survey team, or the vessel itself will be aligned assuming instruments inside the vessel are aligned by installation
- Section 1:
- Reuse old mount if possible
- Valve will be ISO standard, following drift tube will be adapting ISO on one side to CF on the other side -> design needed
- Section 2:
- DB and QP to be independently alignable, will require moving DB a bit downstream and QP a bit upstream to fit hydroformed bellows
- Ideally, shared mount with independent tables for alignment
- How much misalignment can the hydroformed bellows take? About +-1mm
- Section 3:
- Align electrodes with respect to center flanges and then align vessel with respect to center flanges -> adapter to mount targets inside electrodes to be designed
- Section 4 & 5: MIRACLS hardware, to be aligned with theodolite as was done before. Support to be designed by EP-SME-IS (Lukas)
- Section 6: same as section 3
- Section 7: Straight flanges on DB, bellows will not be welded directly to the DB. Stiffness of ZQNA Elena QP support structure to be checked.
- Section 8: to be combined with section 9?
- Section 9:
- Mapping and aligning switchyard electrodes to be discussed. Disassembly planned for 29th of May.
- Kicker will be fixed with respect to the vessel, only bender to be aligned -> procedure to be found
- Section 10:
- Section 11: only DB, ends in a vacuum valve, no bellow between
- For handover points: no bellow on the downstream side of DBs, as valve has to be supported by DB itself
There are minutes attached to this event.