Speakers:
Claudio Luci
(Sapienza Universita e INFN, Roma I (IT)),
Enrico Tusi
(INFN e Universita Roma Tor Vergata (IT)),
Eric Ballabene
(University and INFN, Bologna (IT)),
Gian Luigi Alberghi
(Universita e INFN, Bologna (IT)), Dr
Gianluca Bianco
(Universita e INFN, Bologna (IT)),
Giulio Aielli
(INFN e Universita Roma Tor Vergata (IT)),
Marco Sessa
(INFN e Universita Roma Tor Vergata (IT)), Mr
Mohamed Zaazoua
(University of Science and Technology of China (CN)),
Sabrina Perrella
(Sapienza Universita e INFN, Roma I (IT)),
Sinem Simsek
(Istinye University (TR))
- HV Scan completed
- HV scan points
- RPC in not ready because of HV channels used in HV scan (9000V) [e-log and e-log] and (8800V) [e-log].
- HV channels used for the HV scan are set back to standard: VConfig=9350V, unmasked all connected gas gaps [e-log].
- HV
- BOL.B.09.CO.Ly1.HV ramped down to 5000V, ramped back up to 9100V [e-log].
- BOL.B.09.CO.Ly1.HV ramped down again, ramped back up to 8800V; BML.C.07.CO.Ly1 ramped down, ramped back to 8800V [e-log].
- LV
- BMS4C10 Vpd channel was on "overcurrent" [e-log].
- ADC board with high temperature
- Change of alarm thresholds for the LV board with high temperature (Y_3605_X8_C5/H1/br03/crate5/slot05) [e-log].
- Hardware connected to the LV board with high temperature (Vee and Vpd for sectors 3 and 4 Pi Ly0 and Ly1) switched off [e-log].
- HV issues during TS
- BML.B.01.CO.Ly1, BMS.C.02.PI.Ly1, BOS.A2.02.CO.Ly0 and BMS.B.04.CO.Ly0 HV channels ramped down [e-log].
- BOS.A2.02.CO.Ly1 HV channel tripped [e-log].
- BML.B.01.PI.Ly1 and BML.B.01.PI.Ly0 HV channels ramped down [e-log].