RPC weekly meeting

Europe/Zurich
5/R-026 (CERN)

5/R-026

CERN

15
Show room on map
Davide Boscherini (Universita e INFN, Bologna (IT)), Mohamed Zaazoua (University of Science and Technology of China (CN))
Description

Weekly meeting about the RPC system activities

Zoom Meeting ID
61128581037
Host
Davide Boscherini
Useful links
Join via phone
Zoom URL
    • 09:00 09:15
      Communications to/from the gas group 15m
      Speakers: Beatrice Mandelli (CERN), Enrico Pastori (INFN e Universita Roma Tor Vergata (IT)), Gianluca Rigoletti (CERN), Kacper Kapusniak (CERN), Roberto Guida (CERN)
    • 09:15 09:35
      Detector/LVL1 status 20m
      Speakers: Claudio Luci (Sapienza Universita e INFN, Roma I (IT)), Enrico Tusi (INFN e Universita Roma Tor Vergata (IT)), Eric Ballabene (University and INFN, Bologna (IT)), Gian Luigi Alberghi (Universita e INFN, Bologna (IT)), Dr Gianluca Bianco (Universita e INFN, Bologna (IT)), Giulio Aielli (INFN e Universita Roma Tor Vergata (IT)), Marco Sessa (INFN e Universita Roma Tor Vergata (IT)), Mr Mohamed Zaazoua (University of Science and Technology of China (CN)), Sabrina Perrella (Sapienza Universita e INFN, Roma I (IT)), Sinem Simsek (Istinye University (TR))
    • 09:35 09:50
      Noise issue 15m
      Speaker: Mr Mohamed Zaazoua (University of Science and Technology of China (CN))

      Kepping off BOL.B.09.CO.Ly0.RO and BML.A.15.CO.Ly0. more in https://atlasop.cern.ch/elisa/display/559818

    • 09:50 10:00
      Summary of Monday access 10m
      Speaker: Mr Mohamed Zaazoua (University of Science and Technology of China (CN))

      Access summary: https://atlasop.cern.ch/elisa/display/559818

    • 10:00 10:10
      Resin update 10m
      Speakers: Ahmet Renklioglu (Istinye University (TR)), Dr Aydin Ozbey (Istanbul University-Cerrahpasa (TR))

      The numbers of foam injections performed to date are as follows:
      YETS 21/22 = 100 Boxes
      YETS 22/23 = 277 Boxes
      YETS 23/24 = 224 Boxes

      During the foam injections performed in YETS 21/22, the foam was applied to only 2 of the 4 corners of the chambers.

       In YETS 22/23, the four corners (4 corners of 1 dz) of 58 layers (30 DZ) and the eight corners (8 corners of 2 dz) of 40 layers (20 DZ) were covered with foam. Only one possible leakage was detected in one layer of one DZ through DCS. The mentioned layer has foam applied to all four corners, and the leakage might have originated from the other DZ.

      In YETS 23/24, the four corners of 46 layers (23 DZ) and the eight corners of 24 layers (12 DZ) were covered with foam.  Two of the layers with foam applied to all four corners had leakage, which may have originated from the other DZ.

      The data mentioned here are those of the chambers with 4 or 8 corners covered with foam that we can control through DCS. Besides these, the results of the chambers we repaired on 1, 2, or 3 corners when calculated based on the manometer tests from the past YETS, are 99%, as I presented during YETS.