10–12 Dec 2024
Royal Plaza Montreux & Spa
Europe/Zurich timezone

Session

Setting the Scene

10 Dec 2024, 10:35
Royal Plaza Montreux & Spa

Royal Plaza Montreux & Spa

Av. Claude Nobs 7 1820 Montreux Suisse

Conveners

Setting the Scene

  • Jorg Wenninger (CERN)
  • Giovanni Rumolo (CERN)

Presentation materials

There are no materials yet.

  1. Kevin Shing Bruce Li (CERN)
    10/12/2024, 10:35

    Keywords: Achievements (FT, LIU), Stand vs. BCMS, protons & ions, equipment needing attention and progress in monitoring, limitations emerged and perspectives, impact on operational efficiency of filling scheme (3x 36b vs hybrid)

    Go to contribution page
  2. Dipanwita Banerjee (CERN)
    10/12/2024, 11:05

    Keywords: BSI calibration results, ASM planning proton sharing, electron beam quality in H6/H8 electron users, High intensity muon beam test in M2 (road to have higher intensity post-LS3), record high intensity electrons in H4, operation of H4-VLE (Neutrino Platform), CEDARs operation, user changeovers/preparations/planning, low momentum in East Area, East Area variable spill lengths. Major...

    Go to contribution page
  3. Davide Gamba (CERN)
    10/12/2024, 11:35

    Keywords: Operation of facilities, is modeling adequate, e.g., optics, impedance, aperture?, opportunities for automation and test bench new algorithms, critical equipment, integration of operation, need for instrumentation? feedback from experiments (AD/ELENA, AWAKE)

    Go to contribution page
  4. Dragoslav Lazic (Boston University (US))
    10/12/2024, 12:05

    Keywords: 2024 highlights of EA, NA, nTOF, ISOLDE physics results (‘where protons are going’), beam quality (client view), upcoming expectations for 2025-6 (physics/infrastructure requirements & beam characteristics)

    Go to contribution page
  5. Delphine Jacquet (CERN)
    10/12/2024, 12:25

    Keywords: Achievements and limitations, Standard vs. BCMS (brightness, tails), beam quality from injectors and preservation, high intensity, protons & ions, equipment fault analysis (why was summer such a good production period), operational efficiency, super-smooth injection and filling. Summary of ion operation.

    Go to contribution page
  6. Federico Alessio (CERN)
    10/12/2024, 14:10

    Keywords: 2024 highlights of physics results (‘where protons are going’), beam quality (client view), upcoming expectations for 2025-6 (physics/infrastructure requirements & beam characteristics)

    Go to contribution page
  7. Benoit Salvant (CERN)
    10/12/2024, 14:35

    Keywords: MD threads & requests, MD time allocation & adequacy including preparation (e.g., prep for LHC MDs in injectors), impact of intensity limitations on MD program (injectors, LHC), organisation and execution, relevance to operation

    Go to contribution page
Building timetable...