10–12 Dec 2024
Royal Plaza Montreux & Spa
Europe/Zurich timezone

Session

Operation <-> Equipment

10 Dec 2024, 15:05
Royal Plaza Montreux & Spa

Royal Plaza Montreux & Spa

Av. Claude Nobs 7 1820 Montreux Suisse

Conveners

Operation <-> Equipment

  • Nikolaos Charitonidis (CERN)
  • Giulia Papotti (CERN)

Presentation materials

There are no materials yet.

  1. Panos Zisopoulos (CERN)
    10/12/2024, 15:05
    • focus on injectors only
    • risks to be taken, and difficulties to be encountered
    • what could be anticipated in 2025/26 to optimise the post LS3 restart? e.g. needed studies
    • proposal for a LIU Reliability Run; additional MDs to explore limits?
    Go to contribution page
  2. Jack Heron (CERN)
    10/12/2024, 15:30
    • results of fault analysis per machine (including Exp. Areas)
    • how are the results used? what is AFT ‘actually’ offering? e.g. proactive maintenance
    • follow-up structure and reporting?
    • features to be added, feedback from users (tools and automation covered in Session 6)
    Go to contribution page
  3. Boyan-Kaloyanov Naydenov Popov (CERN)
    10/12/2024, 16:00
    • IR8 cooling capacity and known limitations, available margins
    • follow up on delaying of cryo valve opening (resulting in losses and dumps due to fast growing orbit oscillations, in 2023)
    Go to contribution page
  4. Charles-Mathieu Genton (CERN)
    10/12/2024, 16:20
    • mains regulationa and overshoot follow-up
    • 50 Hz noise effects on SFTPRO spill, and on protons and ion LHC flat bottom losses;
    • prospects for corrections on the hardware side
    Go to contribution page
  5. Inaki Ortega Ruiz (CERN)
    10/12/2024, 17:10
    • equipment from commissioning to operation, exploitation and maintenance of existing instrumentation (focus up to 2026)
    • HL preparation, NA-CONS and ECN3, ACC-Cons, feedback from BIFT on upcoming
      consolidation efforts and items not covered
    • BSI, BGC, BGI, wire scanners, …
    • ion beams
    Go to contribution page
  6. Dr Sam Pitman (CERN)
    10/12/2024, 17:30
    • Thales plants: high failure rates, limited RF power
    • status of understanding, solved and open issues, solutions and prospects
    Go to contribution page
  7. Giorgia Favia (CERN)
    10/12/2024, 17:50
    • KFA71: missing pulses and availability; status, ongoing analysis (including EPA WP8), monitoring and future plans
    • MKP: new voltage settings on MKP-L (are losses at flat bottom measurably better; plan towards nominal settings); plans to offset MKP to reduce beam induced heating on MKP-S (margins?)
    • MKDH: strategy in case of replacement, options and implications on restart after...
    Go to contribution page
  8. Rui Franqueira Ximenes (CERN)
    10/12/2024, 18:10
    • highlights of recent equipment designs, bright ideas, i.e. the bright side of the session, what was done right
    Go to contribution page
Building timetable...