10–12 Dec 2024
Royal Plaza Montreux & Spa
Europe/Zurich timezone

Session

Beam dynamics modelling <-> Controls, data and automation

12 Dec 2024, 08:45
Royal Plaza Montreux & Spa

Royal Plaza Montreux & Spa

Av. Claude Nobs 7 1820 Montreux Suisse

Conveners

Beam dynamics modelling <-> Controls, data and automation

  • Verena Kain (CERN)
  • Giovanni Iadarola (CERN)

Presentation materials

There are no materials yet.

  1. Szymon Lopaciuk (CERN)
    12/12/2024, 08:45

    Xsuite: overview on status and long term plans.
    Opportunities from transitioning to modern technologies(e.g. python integration, live simulations in operation and MD, integration of AI)
    Integration of (full) simulators in control system - status, challenges, required collaborations
    Synergies in modelling and design choices between next generation of accelerators and present ones.

    Go to contribution page
  2. Riccardo De Maria (CERN)
    12/12/2024, 09:15

    Current status of equipment integration description and configuration across sector and ongoing efforts (E2A)
    Where do we want to go?
    Are current efforts for cleaning up “digital thread” sufficient?

    Go to contribution page
  3. Marcin Sobieszek (CERN)
    12/12/2024, 09:40

    NXCALS, JAPC, LSA: overview of users needs and experience
    Introduce “Smart and agile equipment paradigm” from EPA WP8: online and offline analysis requirements
    Introduce the developments of DPP and timelines
    What about GPUs for advanced analysis and integration of active and continual learning schemes?

    Go to contribution page
  4. Francesco Maria Velotti (CERN)
    12/12/2024, 10:05

    Why surrogate models and why surrogates with ML?
    How to incorporate inductive bias? PINNs, symmetries,…
    Examples and prospects
    Infrastructure requirements for full integration in control room (storage, refer back to previous talk,…)

    Go to contribution page
  5. Anton Lu (Technische Universität Wien (AT))
    12/12/2024, 11:00

    Status and prospects for required magnetic measurements
    Modeling techniques
    Timeline and prospects

    Go to contribution page
Building timetable...