Present: Gilles, Gunn, Nuno

Discussion:

  • Brief introduction of the situation and BGI project to Nuno (EN-EL)
  • Nuno: We don't have AC power contribution in the BGI PLAN IDs, Gunn will add it into the BGI PLAN ID
  • Gilles: The POLARIS converters (x4) shall be connected to a 400 V Electrical Rectifier Departure (ERD) with cable configuration of three phases + protective earth (3P + PE), the Neutral is not required. The AC plugs ratings should be 100Arms: this will need confirmation when magnet design is finalized (TE/MSC). Therefore, no request has been made so far to EN/EL
  • Gilles: There is possibility of 3rd PC after LS3 (if money available) as a spare. So we would like to request 3 AC sockets on each side of point 4.
  • Nuno: at the moment there is no dedicated EN-EL person incharge of AC powering in point4 but he will check with his team to see how to proceed.
  • Nuno: For installation in EYETS24-25 it looks unlikely due to short notice. To be checked with EN-EL team.
  • Gilles: The PC are part of north area project, and are expected to receive in March 2027, so there is no need to rush for installing it in EYETS.
  • The discussion to be followed up once the magnet design is finalised and that the location of the power converters have been fixed.
There are minutes attached to this event. Show them.
    • 09:30 → 09:50
      AC power requirement for magnets in point4 20m

      See meeting meenites

      Speakers: Gilles Le Godec (CERN), Gunn Khatri (CERN), James Storey (CERN), Nuno Dos Santos (CERN)